NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO, INC.
0
Mr. Walter Weems
September 1, 1998
Page Two...
E) Core drilling from 7th floor to 23rd floor. $107,900.00 Y
4. Furnish and install auxiliary contacts in each circuit breaker
of switchboard EDPH-23 as per Drawing E3.01, Note #25
dated 7/24/98. Cost of wiring from each circuit breaker to the
Graphic annunciator is included under the graphic annunciator
above. Please see Item #1. $1,600.00 y
5. Change switchboard EDPH-23 from switch fuse to circuit
breakers panel due to the space problem, as discussed with
the engineer. $11,740.00
6. Change the interrupting capacity of Panel EDPH-23M from
65KA to 100KA. $7,080.00-
7. Furnish, install and wire additional fire alarm devises as per
revised Drawing E4-03 dated 7/24/98. $3,205.00
8. Provide and install additional circuit breakers to Panel EHP-1
and ELP-23W as advised by the engineer. $1,360.00
9. Upgrade the size of ground conductor to 1 #2 in 1 1/4" conduit
as per Drawing #E3-01 dated 7/24/98. $3,690.00
Audio Visual Work and Equipment
I
Area; Press Room
Delete;
Fiber distribution system, includes broadcast quality video
and balanced line level audio, with intercom. Miscellaneous
hardware, switches, relays panels, connectors, cabling,
lamps, terminal blocks, wall plates, etc., necessary to insure
a complete and operating system. <$141,482.00>
FORCE QUOTE #Q80406MA
Forward...
NYC-WTC_000172099