NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/WTC/PA TAA: Application forums
Document / 26 pages

Milo Kleinberg Design Associates fax cover sheet, July 17 1997

Machine-extracted title · confidence 95%

Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.

NYC-WTC_000168166–000168191

Folder label: “WTC/PA TAA: Application forums

Page image
Scanned page image, NYC-WTC_000168186
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document JUL 17 ’97 @3:45PM SILVERSTEIN PROP P.12 07/17/97 THU 11:85 TEL 212 725 0398 MILO KLEINBERG 011 _ MAY—23-1987 12:05 Poll ‘Rider “C* , Special Requirements 81, Audibilivy of the Fire Alarm Communications Symem must be mainte’ d, as required by New York City Building Code Sections 27-972 and 27-975. a) A preliminary audibility test of the axiating Fixe Alarm Ca the prevance of WIC Construction Inspestor, Fire Bafety Tepresentative prin te comrmmennent of any work in the tact find the audibility unsatisfactory, the Pert Autharity will are eaticfastory, ne action is required by ths Port Authority. written copy of the Tear results which are to be submitted to unica ions Syatem shall be done in eax, 10 Contyacter and » Tenant I dhe result of this i «: rrestive accion. Lf the recults Pc :; Authoricy shall receive 4 Fi | Gafety Engineer. b) After construction is completed, and as part of the final inspeption, | 2 aodibility test must be partorned in the precenes of a WIT Construction Inspector. H the | st rapul are uasasiafartncy, it ia than the responsibility of the Contractor to correct the ert ' vith the additional spealars end/er amplifiers, as required. 32. If sprinklers are being installed, four (4) black and whites and one (1) producible copy of Shop Drawing(s) and Hydraulic Caloulations mampad “Approved” by the Az‘ 1ites/Engineor of Record must ba submitted to the WTC Project Manager for approval. . 33. The Tenant chal! insulate those 17°x 8” supply ducts that arte parallel : ith the Nosth and South in Twe World Trade Center, and the Eest and West exposure: a One World Trade Centex. A aupy of the criteria for this work entitled; “Supply Duct Insulation Spa | icarian”, dared June 4, 1983, can be obtained from the World Trade Center Planning and Design Pro | ex Manager. 54. No Tenant shell connest 12 World Trade Canter base building pnepmati ; conerol piping. Lf pneurnatic eontruls are required, the Tenant chall provide his own comprnaacs: 38. All proposal public corridor signage not being provided by the Pos Avi | sity, ineluding deor signs, shall be submitted to the WIT Project Manager for review and ap priar w fabrication, installation of customized signs art only permitted on Flex wood doors. 36. The drawings dated ar revised dated, an referred to on the Application | irm aro the only drawings released for construction by the approval of this Teasnt Alteration Appl | ation. Additional drawings, or the above mentioned drawings with new revision dates are not @ppy | ad for contraction unless approved io writing, which ia signed and issued by the WIC Projact Mz : ager named herein. No other drewhags are permitted to be used on the construction site. 87, Ravail tenants shall be responsible for protecting their stare fronts with | . wricades that incorporate the World Trade Center's design standards. | 38. Delivery of material to the World Trade Canter via the Barclay Street mm | p entrance is limited to trucks and trailers not exceeding 11°-9” in height unloaded. 39. The Contractor shall notify the Tenant's Architect/Engineer of a ithe WTC Supervising Engineer of any Moor penetration: that are net shown on the con a& wings. Any necessary remedial closing of penetrations shall be as directed and supervised by 1: Tenant's Axchitect/Engineer in accordance with the requirements of Irem 15 abo: |. 40. Certification by the Registered Architect, or Professional Engince, of th Applicant's choosing shall be executed by an authorised officer of the Applicant and zhall be subm tad te the Port Authority prior to eeeupency. Such cardficate shall declare that the construction * : tk hes bean satisfactorily completed for occupasey in accordance with the approved plans and sp : ifieations and all jurisdictional building codes. Page 6/7 05/23/97 FRI lls! I[TX/RX NO 9682) NYC-WTC_000168186

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168186Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168193 · Box 7DCAS

Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, listing TAA application forms and riders.

Filed in the same folder

Compare copies and versions →