NYC 9/11 Public Portal Document
JUL 17 'S?P AS LePM SILVERSTEIN PROP P.6
07/37/97 THU 11:31 TEL 212 725 0398 MILQ KLEINBERG > a6 foo
_MAY-23-1997 12:28 | ;
| Hevieed Seen, 1995
wp WORLD TRADE CENTER
TENANT CONSTRUCTION OR ALTERATION to aPPLicatron
Tenant: Lease Na: WT- |
Contract No.; WTC = . Tenant Alera App! : ation No.:
Filing Fee No
Rider “C*
Ceneral Requirement:
A 1. @) The WIC Project Manager (Planning & Design Division) for phic Ts AL is
located ax 1WT, Suite 36 South, Telephoue: 212-435-_|__
b) The WTC Supervising Enginear is Mr. Joseph Pansbianca Vutec ax 1WTC, Buire ,
Telephone: 212-455-8226
2. In case of start of sanseruction vie an approved Tenant Alteration | i wen, or otherwise, it cball
be the ate sibility of the Tenant, or bia Consultant te comply ax additional requireranta
result Port Authority review.
|
3. Only the Contractor, whose signature appears an this Application and b | sub-contracturs, will be
permitted to begin work at the construction site after approval of hie Ce ' ification ef Insurance. Any
other Cantreector who may be required to perform work under thig App) | etian will soc be permitted
to work at the construction site until he prevides a separete Certification of Insurance which iz
sppreved by the Port Authority. - i
4. The Contractor chall notify the WIC Supervising Engineer and the | af WIC Plant and
~ Seructune, or their desigoatad repryscntatives, regasting any request for al i down of bass building
utilities which will cause interruption of eevices in other aruas of the build : ¢ . Guah request must be
delivered to the Manager of WTC Plant and Structines at least can (10) wo : Siag dpe peiar ta the
requested shurdown and shell be subject to the final approval of the Manage 9 WTC Place and Structures,
S, All arraxigements for wemporary atilides, garbage removal, clevater servi : 4, ete., ate the
responsibility of the Contractor. |
6. The Conrreector chal! at no time averioad the Seight clevarors with jhis m ; terials. Farther, in order not
te create an unsafe condition, he shall notify the Port Auchority Ingpeete | whanevar the weight of the
materials will excoad 50% of the capacity of the elevater. In ouch eases, | ¢ Part Autharity
will make arrangements to have the elevatoy maintenance personnel tésn : orerily suppent the elevator
cab to prevent it from being out of level during loading as a resule Af ea! lt awrench. The Conwactor
shall reimburse the Port Authority for the cost of WTC Operations, ‘Tamia | aanee personnel ot the rate
of 855.00 per how.
7. The approval af all Shop Drawings 1: the responsibility of the Thnants C sultant. Approved copias
of same shall be submited to the World Trade Center Projeee Manoee Ff record purposes,
8. The Contract Drawings duly appreved by World Trade Center Planning | i Design Division, and
Shop Drawings approved by the Tanant’s Consultants shall be the only ds | wings used fot conecructian.
9, All work under this Tenant Alveration Application will be subject teiPort thority inspestian to
enaure thar it is in conformance with approved Contract Drawings, Speci! ations and Shop Drawings.
!
| Page 177
05/28/07 FRI iis: | LTX/RX NO 8982)