| Ravinad Sop. 1995
a,’ WORLD TRADE CENTER
. TENANT CONSTRUCTION OR ALTERATION APPLICATIO?
.
Tenant: Lease Na.: WT- |
Conwact Ne.: WIC- ___ Tenant Alteration Appl | atioa No.:
Filing Fes No.:
Rider “C*
Gensral Requirements |
A 1. 2) The WTC Project Manager (Planning & Dasiga Division) for TA. is
located ax 1WTIC, Suite 86 South, Telephone: 212-435-
|
b) The WIC Supervising Enginear is Mz. Joseph Panebiaoco pene at 1WTC, Buice
‘Telephone: 212-495-3226,
2. In case of sure of construction via an approved Tenant Alteration pel. ition, or otherwise, it shall
bs the responsibility of the Tenant, or bis Consultant t comply with ay | additional requirements
remilting from Port Authority review. |
4. Only the Centracnor, whose signature appaars on this Application aud bh : sub-contractors, will be
permitted to begin werk at the construction site after approval of his Ce: ification of Ineursnce. Any
other Contracter whe may be required ro perform work under th Ape) ation will not be permitted
to work at the construction site und! he provides a separere Certification sf Insurance whish is
appteved by the Pert Authority. - | |
4. Toe Controcrsbal rely the WIC Superviing Baginnr and he Blanag af WTC Plant and
‘ Structure, or theis desiguuted representatives, regarding any recquest for sbi | Jown of bess building
utilitiee whieh will caure interruption of amvices in other arena of the build ; 2, Such request must be
delivered to the Manager of WTC Plant and Structures at least tou (10) we dog days prior to the
requested aburdown and shall be subject to the fina! epproval of the Manage € WTC Plans and Siruetiures,
5. All arrangements for temporary utilides, garhage removal, clevavot servi | w, ete., are the
reaponsihiliry of the Contractor. |
6. The Contrector abs) at no time overload the freight elevators with hs m | terials, Farther, in. order not
te armate an unsafe condition, he shall notify the Port Authority Ingpeces whenever the weight of the
materials will exceed 50% of the capacity of the alawater, In euch cases,’ |. Port Authority Inepector
Will make arrangements te have the clovator maintenesce persontel teen : oraxily support the elevator
cab to prevent it from being out of level during loading a: a result pf eal |1 stretch. The Conmnetor
shal! reimburse the Port Authority for the cast of WTC Operadons ima nance personnel at the rate
of 855.00 per hour.
7. The approval of ell Shop Drawings ls the responsibility of the Tenant C ‘wultants. Approved copies
of same shall be submitted te che World Trade Center Project Manges f : record purposes.
8, The Conract Drawings duly appreved by World Trade Center Plarining | | Design Division, and
Shop Drawings approved by the Tenant's Consultants shall be the only ch | wings used for construction.
9. All work under this Tenant Alteration Application will be subject te/Part . uthority inspection to
engure that it ia in conformance with approved Contract Drawings, Rpecil ations and Shop Drawings.
Pags 177
(05/28/87 FRI lise: (TX/RX NO 8982)
NYC-WTC_000168176
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000168176Source: NYC Law Department, mirrored locally