NYC 9/11 Public Portal Document
JUL 17 '97 03:15PM SILVERSTEIN PROP P.ll
07/17/8T THU 11:3S TEL 212 72S 0398 MILO SLEINBERG @011
. MPV-23-1957 12!03 P.ll
Rider “C*
Special Raquhrements
31. AudSbOhy of the Fira Alerm Communicadens System must be roeiatai . d, as ntpiind fay Nev York
City Building Cede Sections 27-972 and2<C975.
A preUnuoAry AudiLdUty test of the cxieuo^ Futt AImiH Conui luaiet i low SyMuta shall he dotw in
the pnMaee of TTC Conntuodon IxwpeAw, Fan Safety Bag lao; ; to Gewtnntwr cad a Ihnant
rapmeotadva prior to commvaetttMt ef nay woib in the 6«t ig.1 ihcxMutu ttfthii p»«limlaaiy
tort find die audibility unuticfaeaiiy, die Feet Autberity will ■in < i itoodve aednn. If the results
are sadsiaotory, no oodon t« mquked by the Port Aofhority. 1 * Ft ; Autheriiy chall neclve a
wzieten eapy <4 tb« Ten rasulti which an to he mthnittMl to a Pi I Safely E^naar.
h) Aficr eoaMtuction is completed, and M put of chc fiaal ii I a audthility tnt xnW be
pcffisnaod in the prarance of a VTC Cotunractioa Inspector. dm »« mnUcs aw naaaficfiiatoiy;
it ia thcB die rMpcuadhility af die Ceatraoer to comet dm paMew ' rith the addltiaoal iptokcn
and/oe amplifien, as requited.
22. If cprialdew are being installed, four (4) black cad whites and oa t (1) fnadueible copy of Sikop
OiewingCc) and Hydraulic CeiealncteAC nampad “Approved* by i be Al xitectZEftfinew «f Maeard
must he sidsmitsed to die WTC Project Manager far spprevcL
33. The Tboect shall insulate those 17"x 8’ siqjply ducts that era pa allel - ■ th the North and South
expesuras in Two World Trede Center, arid the Best end Wen esppsurei n One World Ibede Center.
A copy of (he oiteria for this work entitied; “Supply Duet InsuJatiM fifw I Scaiian", dated June 8,1983,
eon be obrsdaad from the Worid Trade Coater Hanhing end Dasig^ Pro (st Manager.
34. Ne Tenant shall connect io World Trade Center bur building pnt control piping. !f pnamnaiic
centoob ora required, the Tenant ahatl provide Ms own eaapiaoa
35. All proposal public oorridar signage a« being provided by die Pom Anh i toby, including door sign^.
shall be submitted to the WTC Project Manager for review and spisovs prior to fabrieation,
iastattation of curtoauxed signs ora only permitted on Flex wood < non.
36. The drawings doted or revised dosed, os referred to on die Applies tion »na ora the only drawings
taleased for txnctouction hy the approval of this Tcaaat Alteration / _
AppI I atioA. Addidond drawings.
er the above mentiaaed dnwiags with new ravisiao datm era net iippra id llor eeuttwtiea nolees
approved ia writing, which is signed and iseuod by the WTC Preji ct Mt sger named henin. No other
drawings an penaitted to be need on the construction site.
37. RfluU teaants chall be raspausible for protecting their stara froote with i irricadec that incorporate
the Vorid Tbsdc Centerb design standards.
38. Daiivery of materiel tn th# World Trade Center vie the Baraley Soiet» । p ootraftc* u limited to
trueles and trailwe not exceeding H’-S” in height unloaded.
39. The Contractor shall notify the Tenant's Atchirect/Eagineer of Redond a i the WTC Supervising
Engineer of any floor penwnitioas that are not shown on die coao^ di; wings- Any necessary
remedial closing of penetrations shall be as directed and supervised by 1 । s ThnOnt's
Anhitect/Bngineer in accordance with the requintments of Item Iq abo' ।.
40. Certification by th* RogiateteeJ Architect, or Profemional Engineer^ of th Applicant's choosing shell
be sRoouted by an audioriaod officer of da® Applicant and sbsJl ba ;subn l>d to ths Port Authority
prior to oeouposiey. Suck certificate shall daelura diet the construe' ion 1 ; rk has been satisfaewrily
completed for occupancy in accordance with the epprorad plans and sp - ificatione and all