NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/WTC/PA TAA: Application forums
Document / 26 pages

Milo Kleinberg Design Associates fax cover sheet, July 17 1997

Machine-extracted title · confidence 95%

Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, listing TAA application forms and riders.

NYC-WTC_000168193–000168218

Folder label: “WTC/PA TAA: Application forums

Page image
Scanned page image, NYC-WTC_000168213
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JUL 17 '97 03:15PM SILVERSTEIN PROP P.ll 07/17/8T THU 11:3S TEL 212 72S 0398 MILO SLEINBERG @011 . MPV-23-1957 12!03 P.ll

Rider “C* Special Raquhrements 31. AudSbOhy of the Fira Alerm Communicadens System must be roeiatai . d, as ntpiind fay Nev York City Building Cede Sections 27-972 and2<C975. A preUnuoAry AudiLdUty test of the cxieuo^ Futt AImiH Conui luaiet i low SyMuta shall he dotw in the pnMaee of TTC Conntuodon IxwpeAw, Fan Safety Bag lao; ; to Gewtnntwr cad a Ihnant rapmeotadva prior to commvaetttMt ef nay woib in the 6«t ig.1 ihcxMutu ttfthii p»«limlaaiy tort find die audibility unuticfaeaiiy, die Feet Autberity will ■in < i itoodve aednn. If the results are sadsiaotory, no oodon t« mquked by the Port Aofhority. 1 * Ft ; Autheriiy chall neclve a wzieten eapy <4 tb« Ten rasulti which an to he mthnittMl to a Pi I Safely E^naar.

h) Aficr eoaMtuction is completed, and M put of chc fiaal ii I a audthility tnt xnW be pcffisnaod in the prarance of a VTC Cotunractioa Inspector. dm »« mnUcs aw naaaficfiiatoiy; it ia thcB die rMpcuadhility af die Ceatraoer to comet dm paMew ' rith the addltiaoal iptokcn and/oe amplifien, as requited.

22. If cprialdew are being installed, four (4) black cad whites and oa t (1) fnadueible copy of Sikop OiewingCc) and Hydraulic CeiealncteAC nampad “Approved* by i be Al xitectZEftfinew «f Maeard must he sidsmitsed to die WTC Project Manager far spprevcL

33. The Tboect shall insulate those 17"x 8’ siqjply ducts that era pa allel - ■ th the North and South expesuras in Two World Trede Center, arid the Best end Wen esppsurei n One World Ibede Center. A copy of (he oiteria for this work entitied; “Supply Duet InsuJatiM fifw I Scaiian", dated June 8,1983, eon be obrsdaad from the Worid Trade Coater Hanhing end Dasig^ Pro (st Manager.

34. Ne Tenant shall connect io World Trade Center bur building pnt control piping. !f pnamnaiic centoob ora required, the Tenant ahatl provide Ms own eaapiaoa

35. All proposal public oorridar signage a« being provided by die Pom Anh i toby, including door sign^. shall be submitted to the WTC Project Manager for review and spisovs prior to fabrieation, iastattation of curtoauxed signs ora only permitted on Flex wood < non.

36. The drawings doted or revised dosed, os referred to on die Applies tion »na ora the only drawings taleased for txnctouction hy the approval of this Tcaaat Alteration / _ AppI I atioA. Addidond drawings. er the above mentiaaed dnwiags with new ravisiao datm era net iippra id llor eeuttwtiea nolees approved ia writing, which is signed and iseuod by the WTC Preji ct Mt sger named henin. No other drawings an penaitted to be need on the construction site.

37. RfluU teaants chall be raspausible for protecting their stara froote with i irricadec that incorporate the Vorid Tbsdc Centerb design standards. 38. Daiivery of materiel tn th# World Trade Center vie the Baraley Soiet» । p ootraftc* u limited to trueles and trailwe not exceeding H’-S” in height unloaded.

39. The Contractor shall notify the Tenant's Atchirect/Eagineer of Redond a i the WTC Supervising Engineer of any floor penwnitioas that are not shown on die coao^ di; wings- Any necessary remedial closing of penetrations shall be as directed and supervised by 1 । s ThnOnt's Anhitect/Bngineer in accordance with the requintments of Item Iq abo' ।.

40. Certification by th* RogiateteeJ Architect, or Profemional Engineer^ of th Applicant's choosing shell be sRoouted by an audioriaod officer of da® Applicant and sbsJl ba ;subn l>d to ths Port Authority prior to oeouposiey. Suck certificate shall daelura diet the construe' ion 1 ; rk has been satisfaewrily completed for occupancy in accordance with the epprorad plans and sp - ificatione and all jurisdictional building codes. P«Be6/-?

0B/23/B7 FBI 11!-! [TX/RX NO 9BB2J

NYC-WTC_000168213

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168213Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Lease Agreement for 7 WTC, Mar 1998 · Box 7DCAS

NYC-WTC_000169723

Official lease agreement between the City of New York and 7 World Trade Company, L.P. for space at 7 World Trade Center.

6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.937

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168166 · Box 7DCAS

Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.

Filed in the same folder

Compare copies and versions →