Rider “C” ;
Genera! Requirements
17. In the event the Concractor’s werk will affect the sotivation of d | eetrs, or other warning
devices, tha Contractor shall request the WIC Construction 1 have WIC
- maintenance personnel deactivate such devices. During the 4 in} period, the contracter shell
provide qualified personnal to look far any unsafe conditians and|conu :t the appropriate sutherised
pannane! to mike the nesessary aetion, as direwted by the WIG i 19 Inepecner termination
of above stated werk enaditions, the Ceutractor shall requost the
WTC Operations maintenance persounel to activete the sneke
The Contructar shall reimburse the Part Anuhbority far the com af
personnel at the mite of & 45.00 per hour (normal time), or $55.
uring burning and welding operations, the Contractor must use a amc | & eater, Smoke euters are
cvutlelle fram the Por Authority at a rate of $25.00 per day,
Life aay Systems
wiring diagraws, installation procedures and spplicable Shop
Ufa safety systems te bo modified. The drawing: abal) indicata| locat | © ofeable tamnineaane
sequenes of operation, and spenificacions of all the ent parts All thé life safety systetns
shall be connected to the World Trade Center Mulziplex & . Sy: ue involving more thas one
floor shall give a floor by floor fire indication to the Multiplex Byete | . The applicable eyewm
shall include, but not be united w, smoke detection, pre-a syo: os, atid Halon, The
documents required herein shall be submitted for Port Authority ret i sw ar the tima that other
required Tenant Alteration Application doexments are submitted.
b) The Concrector shall perform preliminary testing of all fire and life : fety equipwent and syrtams
te ensure that each canponent of every systam functions in ac da ite with the approved
Contract Documents, including but not mired co all wiring ayjd cot : ectians, flaw alarme, tamper
alarms, electrical controls, smoke detewtegs, automatic damper, int lack devives, oir taming of
piping, and other testing, as directed by the Port Authority. Ad app: ved cubstitute for Halon,
e.g., ait carbon dioside, or other inert gas, or a suitable Freon ay |: used ax @ tert medium
dusing the preliminary tasting of « Halon installation. All prelémina) | and Gnal sting shall be
performed in the presence of sub-ceatrustar's persounel and Pt At‘ secity staff, as required by
the WTC Construction Supervising Enginecr.
c) Avy fire safery work, including but vet limized to, smoke core, | Tinklers, Halon systems,
etz:., shall be completed aad operational priar to the Tenant \# the premises. Occupancy
may be permitted prior to completice of such werk, only if approve by the Port Authority, in
writing. Ig auch instances, the Tenant mus maintain a firs watch ‘he promises during the time
that the promise: remains unattended.
d) The Contractor shall not parfern any construction, hook-up, demel On, ste, at apy locacion
other than within the physical boundaries ef he construction size as |.ewn on the Contrect
Drewings appendad ta the Tenant Alteration Application, Far any w 'k not specifically shown
and noted on the approved Contract Drawings and which is outaide + the construction aits, and
the scope of which is part of the approved Tenant Alteration Applic jon, the contracter shall
submit to the WIC Supervising Enginesr named herein before|the e ; ict routing to be followed in
tha performance of the Work. The routing shal) then be evaluaged 1 b the WIC Asbeetns Control
Section to determine if any asbestos is present and if it might ba dis ; red.
|
|