NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166904
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

Running White Color J On Line White Color Lockout Red Color

Spare lights, shall be provided for a total of twenty-four (24).

The indications shall be of the manual reset type. An alarm silencing switch and "alarm silenced" pilot light shall be included.

Provide form C (n/o-n/c). contacts for each of the above pre-alarms and shutdowns for interface with the BMS system. Extend wiring out to a set of terminals dedicated for this interface for the BMS contractor to connect to.

B. The generator power and control switchgear shall be of the free-standing, deadfront, totally metally enclosed, externally operable type, conforming to N.E.M.A. Class III switchboard construction, consisting of an assembly of standardized vertical sections, each having rigid frame construction of heavy gauge formed steel, including bottom closer plate, rustproofed, primed and painted to provide an overall even appearance. Include a 12" horizontal separation between “service" disconnected feeder devices (circuit breakers). The switchgear shall conform to the following :-

1. No current carrying parts shall be within 12" of the finished floor.

2. It shall have complete phase leg bussing, suitably braced and suitable for the voltage applied. It shall also have a half size neutral bus which shall extend the same len^ as the phase leg bussing. A 3" x copper (base bid) or 4" x ’A" aluminum (deduct alternate) ground bus shall extend for the entire length of the switchboard. The neutral bus shall be bonded to the ground bus by means of (2) 500 MCM insulated copper cables. Bussing indicated as main, including connection to generator circuit breakers, shall be, per phase, as follows:-

a. Main bussing designated with an ampere rating shall be sized based on a rating of 1000 amps per square inch of copper (base bid) or 750 amps per square inch of aluminum (deduct alternate). Where the sum of the generator circuit breaker trip sizes exceeds the indicated ampere designation for the main bus, the rating of the main bus shall be increased, for its entire length to the sum of the generator circuit breaker trip sizes, unless divergent load paths reduce the load requirements. In such case, the divergent sections of bus ("A" and "B") shall total 125% of generator breaker trip ratings, and the rating of each section shall be calculated as:-

OEM PPS-29 Generators 7 WTC March 20, 1998

NYC-WTC_000166904

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166904Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →