Conference Report: 02/20/98
Mayor’s OtBce of Emergency Management
02/24/98
Page 3
ITEM DESCRIPTION ACTION
5.0 2J‘' Floor Mechanical Room Design Issues
5.1 SHCA reviewed Cosentini’s response to SPI comments regarding the evaporative SPPDCAS
cooling towers. SPI accepts the design approach outlined. SPI will request adding,
_proyi3iorti to the tenanUease insure proper maintenance and operation of the
equipment.
5.2 SPI noted that the 2500 amp switch shown on drawing E4.01 is -indicated as by CA
Landlord. SPI stated that bus ducts are provided to the floor and the switch indicated
i.s by Tenant.
5.3 SPI requested a watts'sf Electrical Load Analysis. The floor is designed for 12 CA
vi'atts/sf while the switch specified equates to 32 watts/sf. CA to provide analysis.
oc: C. MeuJiardt-SHCA: J. Mejia-SHCA; R. Hudson-Motorola;
D Milsoin-SM&.W; V Leniesliev-Cosentiiu
liV\5676\*ACeMDOCS'CONFREPOR‘ncn 02-20-90 DOC
Swank- Hayden Connell Ltd./Swanke Hayden Coraiel! & Partners LLP
295 Lafayette Street, New York, New York 10012
212 226 9696, Fax 212219 0059
NYC-WTC_000171244
OCR can misread numbers and units. Confirm readings against the page image before using them.