Meeting sign-in sheet for 7 WTC OEM project, Feb 2001

Machine-extracted title · confidence 90%

Sign-in record for a meeting at 7 World Trade Center involving DCAS and OEM representatives regarding the project.

NYC-WTC_000171242–000171244

Folder label: “Conference Report

Page image
Scanned page image, NYC-WTC_000171243
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ? 2/24/98 16:52 f212'219-0059 SHCA Joseph Ailotia-KJosep Doalngvez 3/4

Conference Report: 02/20.'98 Mayor’s Office of Emergency Management 02/24/98 Page 2

ITEM DESCRIPTION ACTION

2.3 SPI previously stated that 7 World Trade Cenlet falls under Port Authority (PA) SHCA/SPI jurisdiction and the fuel oil tank design shall be reviewed and approved by the PA SHCA to issue drawing A-1-1 dated 01-27-98 to SPI full-size for formal submission and approval by the PA

2.4 Locations of fuel oil pumps required were previously discussed. A fuel oil pump is SHCA required to pump fuel oil from the street fill line 141 to the tank in addition to the fuel oil pump required to pump fuel oil from the Ground Floor to the 7* Floor. It was previously agreed that the fuel oil pumps shall be located within the existing Fuel Oil Pump Room. A previous field visit confirmed that there is sufficient space to add new tenant pumps within this Pump Room. A separate tenant fill line from street to Pump Room is required. Fuel Oil Piping from the Existing Fuel Oil Room to the Existing Televator Room will require trenching the concrete slab including a portion of the Lobby area where there is existing stone finish. SPI approved conceptually the placement of the fuel oil lines within the floor slab including the Lobby.

3.0 7* Floor Mechanical Rooms

3.1 SPI requested the increase of the public corridor width to 6’ -0”. SHCA will review SHCA/Cosentini with Cosentim to confirm if feasible, _

3.2 SPI requested whether a demolition plan and reflected ceiling plan is required SHCA SHCA intends to include plans into the contract documents.

3.3 / SPI requested a memo from Shen Milsom (SM&W) outlining the NC level they are SM&W/SHCA designing to and comparing it to the NC level designed for a Fan Room. SHCA/SM&W to review.

3.4 SPI stated their concern over the design of the intake & exhaust air required for the CA/SHCA emergency generators in terms of air drafts/hot or cold spots for adjacent tenants and tenants above or below. SHCA/CA to review design to minimize temperature differentials and drafts..

3.5 SPI requested clarification for the emergency generators. CA to verify that the CA generators have resistive load banks for testing.

4.0 Radio Room at Main Roof

4.1 SPI accepts the Radio Room design as shown on the 01/27/98 design development Motorola drawings. SPI/Cantor has reviewed the information provided by Motorola for the antenna anchorage details at the existing guardrails. Cantor requested additional structural information from Motorola.

A'ISS76«OEMDOCSnCOM=REPOR'nCR 03-20.98 DOC

Swanke Hayden Conneli Lld./Swankc Hayden Connell & Panners LLP 295 Lafeyette Street. New York, New York 10012 212 226 9696, Fax 212 219 0059

NYC-WTC_000171243

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171243Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.954

machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

5 shared non-person entities · Same agency, volume and box · similarity 0.909

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000169716 · Box 7DCAS

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

Similar indexed content

Compare copies and versions →