? 2/24/98 16:52 f212'219-0059 SHCA Joseph Ailotia-KJosep Doalngvez 3/4
Conference Report: 02/20.'98
Mayor’s Office of Emergency Management
02/24/98
Page 2
ITEM DESCRIPTION ACTION
2.3 SPI previously stated that 7 World Trade Cenlet falls under Port Authority (PA) SHCA/SPI
jurisdiction and the fuel oil tank design shall be reviewed and approved by the PA
SHCA to issue drawing A-1-1 dated 01-27-98 to SPI full-size for formal submission
and approval by the PA
2.4 Locations of fuel oil pumps required were previously discussed. A fuel oil pump is SHCA
required to pump fuel oil from the street fill line 141 to the tank in addition to the fuel
oil pump required to pump fuel oil from the Ground Floor to the 7* Floor. It was
previously agreed that the fuel oil pumps shall be located within the existing Fuel Oil
Pump Room. A previous field visit confirmed that there is sufficient space to add new
tenant pumps within this Pump Room. A separate tenant fill line from street to Pump
Room is required. Fuel Oil Piping from the Existing Fuel Oil Room to the Existing
Televator Room will require trenching the concrete slab including a portion of the
Lobby area where there is existing stone finish. SPI approved conceptually the
placement of the fuel oil lines within the floor slab including the Lobby.
3.0 7* Floor Mechanical Rooms
3.1 SPI requested the increase of the public corridor width to 6’ -0”. SHCA will review SHCA/Cosentini
with Cosentim to confirm if feasible, _
3.2 SPI requested whether a demolition plan and reflected ceiling plan is required SHCA SHCA
intends to include plans into the contract documents.
3.3 / SPI requested a memo from Shen Milsom (SM&W) outlining the NC level they are SM&W/SHCA
designing to and comparing it to the NC level designed for a Fan Room.
SHCA/SM&W to review.
3.4 SPI stated their concern over the design of the intake & exhaust air required for the CA/SHCA
emergency generators in terms of air drafts/hot or cold spots for adjacent tenants and
tenants above or below. SHCA/CA to review design to minimize temperature
differentials and drafts..
3.5 SPI requested clarification for the emergency generators. CA to verify that the CA
generators have resistive load banks for testing.
4.0 Radio Room at Main Roof
4.1 SPI accepts the Radio Room design as shown on the 01/27/98 design development Motorola
drawings. SPI/Cantor has reviewed the information provided by Motorola for the
antenna anchorage details at the existing guardrails. Cantor requested additional
structural information from Motorola.
A'ISS76«OEMDOCSnCOM=REPOR'nCR 03-20.98 DOC
Swanke Hayden Conneli Lld./Swankc Hayden Connell & Panners LLP
295 Lafeyette Street. New York, New York 10012
212 226 9696, Fax 212 219 0059
NYC-WTC_000171243