NYC 9/11 Public Portal Document
1/21/98 10:55 <•212-219-0059 SHCA Joseph AJ iotta^Jeff Kondrat 3/6
CoK-Weiiee Repeir. 01'15/98
Mayor’s C'fHcc of Emcrajcncy Management
01/19/98
Page 2
ITEM DESCRIPTION ACnON
5.0 Architectural Design Progress
3 1 SHCA reviewed plan revisions requested by OEM on the S Ll issuance which are SHCA
reflected on the 01/1.5/98 progres.s D.D. plan presented. OEM approved layout .shown
3.2 OEM confirmed that local UPS battery packs will be utilized instead cf a single UPS SHCA'OEM/
battery room. OEM'SM&W reported that the LAN Room will grow in size to take up SM&W & CA
the UPS program area. A pre-action sprinkler system closet will be required for the
LAN Room. SHCA/CA to incorporate closet in layout.
3.3 OEM confirmed Press Room layout and floor elevations shown and approved by OEM
on the S.D. issuance 12/12/98 is correct as shown.
3.4 SHCA reported that Motorola has reviewed and approved the Watch Command Center
room layout as shown on the 01/15/98 progress D.D. plan
35 SHCA requested an updated equipment list for all equipment (i c. -computers, printers, OEM
fax, copiers, radios, etc.). OEM to provide updated list and cuts of equipment.
3.6 OEM presented a preliminary marked-up plan indicating the layout of 10 functional
groups (PD, FD, etc.) at the 12/05/97 meeting OEM agreed to issue and distribute
this information by 12/08/97. Information has not issued to date.
3.7 SHCA requested at the 12/05/97 meeting both Level 3 and DIAKf security' OEM
specifications for their use. OEM to provide.
SHCA stated at the 12/0.5/97 meeting that the proposed OHM security OEM
consultanL'vendor who will, assist OEM to develop a detailed program, drawings and
specifications, so that, the security work can be coordinated by the SHCA project team
continues to need resolution. Per ‘die 01/16/9S meeting with DCAS/SPl'OEM'SHCA
OEM will arrange for the consultant/’vendor to meet and review required scope of
security consultant services for this project f No action to date.]
3.g Per tlie SPI comments to the 12/12/97 S D. plan, SHCAhas revised partitions to SHCAk
minimize partitions tying directly into exterior window mullions. SHCA hits resolved
all conditions but two locations shown on the 01/15/98 plan. Upon review with AC, it
appears a mutually agreed upon detail is feasible. [Upon Sold review of condition o.n
01'16/98, SHCAAC confumed that the exterior wall on this floor is e.xterior glazed
not interior glazed and a partition tying directly to the mullion is not an issue.]
3.9 SHCA stated that there were several outstanding coordination issue required to be SHCA'SPI
discussed wdth SPI & AC (i e.- Roof Radio Room, rooftop antennas (approx. 30) and
microwave dishes (2), fuel oil tank location and coordination, etc.)
SHCA'SPh'AC/CA/SM&W/DCAS agreed to meet on 01/16/98 to discuss these issues
in a technical coordination meeting. SHCA reported that C..A is studyhng the use of
supplemental dry cooling towers on the 23"* Floor as requested by SPI
3.10 SHCA reported that the 7* Floor Partial Plan (01/12/98) with the emergency generator
and water tank locations have been reviewed by C.'S and is structurally feasible. SPI
has approved this architecturai layout. OEKf/DCAS also reviewed and approved this
layout.
01- jweooc
Sw ante Hayden CowjcU Lld/SwaiAe Hayden Connell & Panners LLP
295 Lafayette Street, New York, New York 10012
212 226 9696. h'ax 212 219 0059
NYC-WTC_000170875
OCR can misread numbers and units. Confirm readings against the page image before using them.