Meeting record, OEM project, Jan 1998

Machine-extracted title · confidence 50%

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

NYC-WTC_000170874–000170878

Folder label: “Conference Report

Page image
Scanned page image, NYC-WTC_000170876
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document I l/2t/98 10:56 r212-219-0059 SHCA Joseph Altotta->Jefr Kondral 4/6

Conference Report: 01/15/98 Mayor’s Office of Emergency Management 01/19/98 Page 3

ITEM DESCRIPTION ACTION

4.0 Structural Design Progress

41 SHCA requested formal approval of the C/S engineering design fees. DCAS approved DCAS/SPI the design fee. SHCA/SPI directed C/S to proceed with the design work. Formal WTitten approval to follow by DCAS/SPI. C/S will proceed by verbal direction at this meeting.

4.2 C.'S confirmed that the design loads for the 7* Floor Emergency Generator and Water Tank Rooms are structurally acceptable. The conceptual structural dunnage shown on the SHCA 7* Floor Partial Plan sketch dated 01/12/98 is shown per SHCAC/S coordination. AC noted that there was sufficient information to budget the structural work.

4.3 SHCA will arrange a separate coordination meeting with C/S to review all the SHC.A/C/S structural engineering issues regarding the rooftop Radio Room, Ground Floor Fuel Oil Tank support, slab penetrations (if any) for mechanical risers and equipment loads on the 23”* Floor (safes, water bottle storage, etc.).

5.0 MEP Design Progress

5.1 SHCA'CA noted that CA is proceeding with analyzing the HVAC loads and design of CA air cooled cooling towers for the supplemental HVAC emergency system instead of the evaporative cooling towers proposed by CA at SPI’s request, 5.2 SHCA'CA requested a separate meeting with SPI/AC to review outstanding HVAC SHCA/CA/'SPI'AC design issues. Meeting is scheduled for 01/16/98 a.m. Issues to be addressed are as follows: cooling tower design, fuel oil tank location and layout, rooftop radio room, capping fin tube enclosure piping within the 23"* Floor Mechanical Room, shaft locations for vertical risers, base building electnc & telecom, closet locations allowed for this tenant’s use, etc. 5.3 CA issued cuts of the emergency generators and switchgear to SPFC/S. AC'SM&W 5.4 OEM confirmed that they require approx. 1 1 i to 2 hours of UPS power should the CA'SM&W emergency generators failed in order to provide orderly shut down of computer equipment and allow enough time to move the EOC operation to another site if necessar}'.

ni-iiqs nor

NYC-WTC_000170876

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000170876Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.936

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →