I 2/24/08 J’ll 3 r212-2!9-r'C59 SHCA Joseph Al lotto-* Jeff Kondrat 3/4
CoiUcience Reooii: 02^'20/98
Mevor’s Office of Emergency Management
O224.'S8
Page 2
ITEM DESCRIPTION ACTION
o 5 SFI previously stated that. 7 World Trade Center falls under Port .Authority (PA) SHCA'SPI
jurisdiction and the fuel oil tank design shall be reviewed and approved by the PA,
SHCA to issue drawing A-1-1 dated 01-27-98 to SPI full-size for formal submission
and approval by the PA.
Locations of fuel oil pumps required were previously discusser; A fuel oil pump is SHCA
required to pump fuel oil from the street fill line up to the tank in addition to the fuel
oil pump required to pump fuel oil from the tjround Floor to the 7* Floor. It was
previously agreed that the fuel oil pumps shall be located within the existing Fuel Oil
Pump Room A previous field visit confirmed that there is .sufficient space to add new
tenant pumps within this Pump Room. A separate tenant fill line from street to Pump
Room is required. F uel Oil Piping from the Existing Fuel Oil Room to the E.vislmg
Televator Room will require trencliiiig the concrete slab including a poition of trie
Lobby area where there is existing stone finish. SPI approved conceptually the
placement of the fuel oil lines within the floor slab including the Lobby.
3.0 7* Floor Mechanical Rooms
3.1 SPI requested the increase of the public corridor width to 6’-0”. SHCA will review SHCA'Cosentini
wirh Co.sentini to confirm if feasible.
3.: SPI requested whether a demolition plan and reflected ceiling plan is required. SHCA SHCA
intends to include plans into the contract documents
3.3 SFI requested a memo from Shen Milsom (SM&W) outlining the NC level they are SWW.-'SHCA
designing to and comparing it to the NC level designed for a Fan Room.
SHCA/SM&W to review.
34 SPI stated their concern over the design of the intake & exhaust air required for the CA/'SHCA
emergency generators in terms of air drafts,'hot or cold spots for adjacent tenants and
tenants above or below. SHCA CA to review design to minimize temperature
differentials and drafts..
3.5 SPI requested clarification for the emergency generators. CA to verify that the CA
generators have resistive load banks for testing.
4.0 Radio Rotim at Main Roof
4,1 SPI accepts the Radio Room design as shown on the 01 <27'98 design developmeni l.loloiola
drawings. SPPCantoi has reviewed tlie information provided by Motorola for trie
antenna anchorage details at the existing guardrails. Cantor re.quested additional
structural information from Motorola.
Sa Hike Haydeu CuuicU Llil./Sv ants HayJai Coimsll & Pmtners LLP
2S5 Lafayette Street. New York New York 10012
212 226 9696, fax 212 219 0059