Meeting record, OEM project, Jan 1998

Machine-extracted title · confidence 50%

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

NYC-WTC_000170874–000170878

Folder label: “Conference Report

Page image
Scanned page image, NYC-WTC_000170877
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

’Y2I/O8 11:09 <*212-219-0059 SHCA Joseph 'J Kondrat 5/6

E wDn eiice Repoi I: 0 T15/9S Mever’s Ofhcc cf Emcracnev Mar.u~ciricr.t 01/'i9<98 Page 4

ITEM DESCRIPTION ACTION

SM&W & CA requirs additional coordination for the type cf power provided to SM&W/CA computers from the emergency generators SM&W requires K-rated generators. 5.6 SHCA noted acoustical concerns reviewed by SM&W regarding the testing and rriaintenar.ee of th.e emergency generators. SP.I stated that the land'ord requires tenants to perform testing and maintenance on off-hours and weekends, therefore, properly designed wall partition and vibration i,solation of the equipmenVpipmg is sufficient. In the event of an emergency requiting the generators to operate, SET noted that the surrounding tenants would unlikely be in their space. SHCA noted that it will ■distribute a SM&W memo regarding this issue. Based upon this SFI direction. SHCA'SM&W will proceed with the level of acoustical sound and vibration isolation

6.0 Telecommunications Design Progress

6.1 SM&W reponed that separate OEWSM&W meetings have been held to coordinate telecommunication design issues Minutes of meetings have been issued. 62 Motorola attended the OLT2/9S meeting to review the radio communication coordination needs. The meeting attendees visited 7 World Trade Center to review the proposed location of the P,adio Room and coordination issues regarding cabling from this room to the north side of the building where the antennas are to be located. 6.3 SM&W reported tiat DEM will issue a teleccm plan by 01/16/98 with ah proposed OEM telecom locanon.«. [Issued by e-mail as agreed on 01-16-98]

7.0 Audio-Visual Design Progress

71 Most design and cooiduration i.ssues recuire O. Hauer-C'EM to be present. SHCA'Shd&W'' SIICA^SM&W will reschedule with OEM ro review outstandurg A-V issues. OEM

8.0 C omputer/LAN Design Progress

8.1 SHCA requested str.tus of software selecticn. Information is required by SM&W in OEM order to coordinate <W and computer hardware/software interface OEM reported final selection of software will occur shortly 8 SHCA requested updated equipment lists, equipment cuts and equipmert locstinn.s for OEM all computer hardware, printers, radios & radio equipment, fax, copiers, etc. for the pro) id team coordination as soon as possible. 8.3 SHCA requested final EOC desk equipment cuts in order to continue development of OEM the desK design.

9.0 Security Design Issues

o1 SHCA reponed that a 01/09/98 meeting was held with SPLDCiXS 'OEM SHCA to review retaining a security consultant to assist OEM in developing their security design. SHCA agreed to assist OEM to review the sec'jrity consultant design proposal and add this consultant to the SHCAproject team. OEM to arrange a meeting the consultant. SHCA previously noted that input from this consultant is outstanding and needs to incorporated into the budget, pricing to be performed by AC.

6a ankc Hayden Ccuiell LliESwanke Haydrai Coimctt & Partners LLP 295 Lafayette Street, New York, New York 10012 212 226 9696. fax 212 219 0059

NYC-WTC_000170877

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000170877Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.936

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →