Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166892
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

K. Provide an integrally mounted automatic circuit breaker located as near as possible to the generator output terqpnals and connected to the generator. Circuit breaker shall be sized at 100% of output current rating of the generator.

L. In conjunction with the generator set, provide a multipole "break glass" switch, located outside of room, and 2 #14 runs in rigid galvanized conduit to the engine control panel and day tank float switch. Connect so as to provide emergency shutdown of generator set and fuel transfer pumping system.

M. Except for the required field installation, and connections, the generating sets, load bank and control switchgear shall be presented at the project as a "single source" item for which responsible "one party" overall maintenance (spare parts and service) is available.

N. In conjunction with each generating set, 15 amp fused, single phase, 2 #12 wires in conduit automatic louver damper connections shall be tapped off the generator output line ahead of the line protective device in the control panel. One such connection shall be included for each electrically operated automatic louver damper provided for the generating set separate from the electric work in ventilating openings for the room housing the set. The connections shall be without switches or any other controls and shall be such that the louver dampers open directly in response to the appearance of the voltage at the output of the generator.

O. Generating sets shall be as manufactured by Cummins, Caterpillar, General Motors/Detroit Diesel, Mitsubishi or other approved.

P. Factory Test

1. Each diesel engine-generator set, shall be tested at the factory to demonstrate compliance with the Specifications. Tests shall be witnessed by the Owner and/or his representative. A certified copy of this performance test shall be submitted before shipment to the job site, with a minimum of the following conditions met. Any defects which become evident during the test shall be corrected before continuing.

a. Each generator shall be capable of attaining rated voltage and frequency under no-load conditions, within five (5) seconds of the initiation of a start signal.

b. Each generator shall operate under full load conditions for a minimum of four (4) hours. The generator set shall maintain rated voltage ±5 volts and rated frequency ± .5 hertz for the duration of the full load test. Voltage, amperage and frequency measurements, as well as engine gauge and monitor points, shall be recorded at 15 minute intervals.

OEM PPS-17 Generators 7 WTC March 20, 1998

NYC-WTC_000166892

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166892Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →