K. Provide an integrally mounted automatic circuit breaker located as near as possible to the
generator output terqpnals and connected to the generator. Circuit breaker shall be sized
at 100% of output current rating of the generator.
L. In conjunction with the generator set, provide a multipole "break glass" switch, located
outside of room, and 2 #14 runs in rigid galvanized conduit to the engine control panel and
day tank float switch. Connect so as to provide emergency shutdown of generator set and
fuel transfer pumping system.
M. Except for the required field installation, and connections, the generating sets, load bank
and control switchgear shall be presented at the project as a "single source" item for
which responsible "one party" overall maintenance (spare parts and service) is available.
N. In conjunction with each generating set, 15 amp fused, single phase, 2 #12 wires in
conduit automatic louver damper connections shall be tapped off the generator output line
ahead of the line protective device in the control panel. One such connection shall be
included for each electrically operated automatic louver damper provided for the
generating set separate from the electric work in ventilating openings for the room housing
the set. The connections shall be without switches or any other controls and shall be such
that the louver dampers open directly in response to the appearance of the voltage at the
output of the generator.
O. Generating sets shall be as manufactured by Cummins, Caterpillar, General
Motors/Detroit Diesel, Mitsubishi or other approved.
P. Factory Test
1. Each diesel engine-generator set, shall be tested at the factory to demonstrate
compliance with the Specifications. Tests shall be witnessed by the Owner and/or
his representative. A certified copy of this performance test shall be submitted
before shipment to the job site, with a minimum of the following conditions met.
Any defects which become evident during the test shall be corrected before
continuing.
a. Each generator shall be capable of attaining rated voltage and frequency
under no-load conditions, within five (5) seconds of the initiation of a start
signal.
b. Each generator shall operate under full load conditions for a minimum of
four (4) hours. The generator set shall maintain rated voltage ±5 volts
and rated frequency ± .5 hertz for the duration of the full load test.
Voltage, amperage and frequency measurements, as well as engine gauge
and monitor points, shall be recorded at 15 minute intervals.