NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT L TRU0929MN02
FEE EXEMPT: Yes
ONLY TYPEWRITTEN
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02
L FACILITY
ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006
TYPE OFFACILITY: BLOCK: 52 LOT: 21
11. BUILDING OWNER
NAME: 120 LIBERTY STREET, LLC Contact _
TEL. N:
ADDRESS: N/A CITY: STATE: ZIP:
W. ASBESTOS ABATEMENT CONTRACTOR
NAME: #Error
TEL. #: (7.18)961.4100 FEDERAL EMPLOYER IDENTIFICATION N: P 11
ADDRESS: 14-20 129 STREET CITY: COLLEGE POINT tiAYE: NY ZIP: 11356
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WK SCHEDULE WIG DAY rlr EVENING GG NIGHT Gl WEEKENDS 1tL WEEKDAYS
c_
INSPECTOR NAME: ' _ETC ' 'D t I Vt SQUAD N: t BADGE #:
DATE OF INSPECTION: / ). ( Off' TIME OF INSPECTION: From: _ AM ) ..PM ❑
To: 1. 0.3 AMC PM
Contact at site: J W 0 L,')z *%j. 'L Z & Yo15
Inspection sclosed that the following sections were
pliedcom with: (Check all that apply)
1.51 - Notifications, Reports, Pla U' _ 1.71 - Air Sampling and Monitorin •91 • Worker Protection
1.101 - Materials and Equipment 0 1.116 • Work Place Preparation J • 17 - Worker Decontamination System 1
[_j
1.118 • Waste Decontamination System 0 1.126 • Engineering Controls ~ 1i27 - Entry/Exit Procedures
11-129- Maintenance of Barriers 0 1.138 - Encapsulation L 1.139. Enclosure
1.140 - Glovebag 1.141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling
1.146 • Preliminary Clean-up 1-147 - Final Clean-up
Project not started _—_ Inspection
revea all ACM to be intact. New start date:
Project ongoing, expected completion date:
U Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat
I j Follow up necessary on _
Samples taken: [ No Lii Yes 1 2 3
4 5 6 Photos taken: O Yes = No
Additionall_comment p —_
_
• i
RESULT CODE
BORO 1 = MANHATTAN 2= BRONX 3 = BROOOKLYN 4= QUEENS 5 = STATEN ISLAND
RESULT CODES I = VIOLATION ISSUED 2 = NO VIOLATION ISSUED • 3 = NO ACCESS
4= PROJECT NOT STARTED (NO NOV) 5= PROJECT COMPLETED (NO NOV)
NYC-WTC 000108285