Document / 8 pages

Asbestos inspection report header, unknown date

Machine-extracted title · confidence 90%

Fragmented header page of an asbestos inspection report for the WTC site, indicating fee exemption and variance status.

NYC-WTC_000107873–000107880

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107875
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0929MN02 FEE EXEMPT: Yes -_ ONLY TYPEWRITTEN - -------- --- --- - -- - - 1. $0.00 APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTEDD ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

6/20/02 PROJ. COMPLETION DATE: 6/30/02 START DATE:

1. FACILITY 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006 ADDRESS: BLOCK: 52 LOT: 21 TYPE OFFACILITY:

H. BUILDING OWNER Contact ~~ NAME: 120 LIBERTY STREET, LLC TEL. #: CITY: _ STATE: ZIP: ADDRESS: N/A

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: CITY: COLLEGE POINT STATE: NY ZIP: 11356 ADDRESS: 14.20 129 STREET VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251

K SCHE LE W DAY n/ EVENING N NIGHT 1 WEEKENDS WEEKDAYS ASBESTOS W C_ INSPECTOR NAME: ~ TC SQUAD #: ( BADGE #: S tS

TIME OF INSPECTION: From: AM PM DATE OF INSPECTION: / Z / O' To: rI ' w AM PM Contact at site: 4.)k' L5)0 L k'O1~< < Z ] ~~15 Inspection isclosed that the following sections were complied with: (Check all that apply) 1-51 - Notifications, Reports, Pla . f71 - Air Sampling and Monitorin 91 -Worker Protection

1.101 - Materials and Equipment i 1.116 -Work Place Preparation - 17 - Worker Decontamination System

1.118 - Waste Decontamination System r 1.126 - Engineering Controls f-1 127 - Entry/Exit Procedures

1-129. Maintenance of Barriers 1-138 - Encapsulation 1-139 - Enclosure

1-140 Glovebag 1-141 -Tent 1.137 - ACM Disturbance, RemoveL, Handling

1.146 - Preliminary Cleanup 1-147 - Final Clean-up

Project not started . Inspection

reve d all ACM to be intact. New start date: / /

Project ongoing, expected completion date:

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on

Samples taken: No Yes 1 2 3

4 5 6 Photos taken: Yes No

Additional comments a.._ d

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND , r__ Z— RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPER~ =-jiIA:CS l 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107875

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107875Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →