NYC 9/11 Public Portal Document
TOTAL FEET: 40805 0
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT TRU0929MN02
FEE EXEMPT: Yes
ONLYTYPEWRItTEN 1. $0.00
APPL/CATlONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED I
.ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑Variance
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02
J. FACILITY
ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006
TYPE OFFACILITY: BLOCK: 52 LOT: 21
II. BUILDING OWNER
NAME: 120 LIBERTY STREET. LLC Contact
TEL. #:
CITY: STATE: ZIP:
ADDRESS: N/A
W. ASBESTOS ABATEMENT CONTRACTOR
NAME: #Error
TEL #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION # :i............ P!!.-.-.-.-.-.
ADDRESS: 14.20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
-VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WO K SCHEDULE Wi DAY eZ EVENING GG NIGHT 5G WEEKENDS GG WEEKDAYS
t,
INSPECTOR NAME: AA L LWIC £'O i SQUAD #: _ BADGE #: A'O Y o
DATE OF INSPECTION: / 1• Z / OZ TIME OF INSPECTION: From: O AM PM E]
1 AM LI PM
.r y 4 1 Ci To:
Contact at site: •
- 4 i
Inspectio isclosed that the following sections were complied with: (Check all that apply)
-I
1.51 • Notifications, Reports, Pla 1 1iir Sampling and Monitorin U 1.91 • Worker Protection
J 1.101 • Materials and Equipment 0 1-116 -Work Place Preparation 17 -Worker Decontamination System,
1.118 • Waste Decontamination System 1.126 - Engineering Controls [j i':I27 - Entry/Exit Procedures
1 1 1.129 - Maintenance of Barriers 1.138 - Encapsulation 1.139 - Enclosure
LJ 1.140 - Glovebag (~ 1.141 .Tent 1.137 -ACM Disturbance, RemoveL. Handling
1.146 - Preliminary Clean-up 1-147 - Final Clean-up
Project not started _ . Inspection
revealed all ACM to be intact. New start date: / /
ii Project ongoing, expected completion date: / / _
J Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat
l j Follow up necessary on _ / /
Samples taken: I No U Yes 1 2_ 3
—
4 _ 5 6 _ Photos taken: O Yes Li No
ti Additional comments: v t. ~; j
_-1 O — —
- 1
RESULT CODE
BORO 1= MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES I = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3= NO ACCESS SUPE SOR INITIALS
• 4= PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000108221