Asbestos inspection report cover letter, unknown date

Machine-extracted title · confidence 95%

Cover letter accompanying an asbestos inspection report for a WTC site, noting fee exemption and variance status.

NYC-WTC_000107861–000107864

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107863
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENT L PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN 1• $0.00 APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL B SUBMITTED ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK I ADVANCE Variance OF START OF THE WORK (ABATEMENT A TIVRIES) 6/20/02 PROJ. COMPLETION DATE: 6/30/02 START DATE:

1. FACILITY ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006 BLOCK: 524 LOT: 21 TYPE OFFACILITY: II. BUILDING OWNER Contact NAME: 120 LIBERTY STREET, LLC TEL. #: CITY: ! STATE: ZIP: ADDRESS: N/A IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION N: PII CITY: COLLEGE POIN STATE: NY ZIP: 11356 ADDRESS: 1420 129 STREET VI, LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 WC, DAY EVENING W NIGHT 4t WEEKENDS W_ WEEKDAYS ASBESTOS WO K SCHEDULE

INSPECTOR NAME: A) L h\Arc SQUAD #: — ` BADGE #:

/32./D ' TIME OF INSPECTION: From: AM M E i DATE OF INSPECTION: b To: AM Lii PM Contact at site: ~~ 4l Inspectlo isclosed that the following sections were complied with: (Check all thit apply) ,—

1.51 - Notifications, Reports, P I ii ir Sampling and M+itorin 1.91 - Worker Protection [ 1T117 - Worker Decontamination System', 1.101 - Materials and Equipment LIII 1-116 -Work Place Preparation 1-126- Engineering Controls L i': '127 - Entry/Exit Procedures L-i 1-118 - Waste Decontamination System 1.129 - Maintenance of Barriers [] 1.138 - Encapsulation j iII 1139- Enclosure

1-140 - Glovebag 1.141 .Tent 1.137 -ACM Disturbance, RemoveL, Handling

1-146 - Preliminary Cleanup LIII 1-147- Final Clean-up —

( Project not started - _ - _ Inspection

revealed all ACM to be intact. New start date: / /__

Project ongoing, expected completion date: / /

Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on / / [ Samples taken: I No LIII Yes 1 2 ' 3 — 4 - --- --- - - — 5 -- 6 Photos taken: L-1 Yes L— ; No

Additional comments: V4 0 y

1 ~

-- - iii iiiiiiiiiii:i

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUE 5 = STATEN ISLAND

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3= NO ACCESS SUPS ISOR INITIALS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT MPLETED (NO NOV)

NYC-WTC 000107863

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107863Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →