NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report form, June 2002

Machine-extracted title · confidence 75%

NYC DEP asbestos inspection report documenting facility assessment with variance approval for work commencing June 20, 2002.

NYC-WTC_000107869–000107872

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107869
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENT*L PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN 1. $0.00 APPLICATIONS WILL 8E NOTE: ASBESTOS INSPECTION REPORT SHALL B SUBMITTED I ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK II ADVANCE ❑ Variance — OF START OF THE WORK (ABATEMENT A ITIVRIES)

6/20/02 PROJ. COMPLETION DATE: 6/30/02 START DATE:

I. FACILITY BORO: MANNA' W ZIP: 10006 ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BLOCK: 52 LOT: 21 TYPE OFFACILITY:

1I. BUILDING OWNER Conta NAME: 120 LIBERTY STREET, LLC TEL. #: CITY: STATE: ZIP: ADDRESS: N/A

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718)961-4100 FEDERAL EMPLOYER IDENTIFICATION N: CITY: COLLEGE POIP STATE: NY ZIP: 11356 ADDRESS: 1420 129 STREET VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIE C/O WARREN & PANZER E NYS ELAP #: 11251

W, DAY W, EVENING NIGHT WEEKENDS hG WEEKDAYS ASBESTOS W K SCHE LE C' INSPECTOR NAME: £ L 5.A_ ~ C9 1 td SQUAD #: BADGE #~?— S d

/ ( / O1 ' TIME OF INSPECTION: From: AM i,g~PM r j DATE OF INSPECTION:

t Tc: 1. Os AM r i PM Contact at site: ) W 0 (— k

Inspection sclosed that the following sections were i lied with: (Check all tha

501 • HOTiTICdIIIMIS, rceNui w, rya _. r t~ I • 71 - Air Sampling and Mohitorin ~ •91 - Worker Protection 1TIi7 •Worker Decontamination System 1-101 • Materials and Equipment LIIu 1.116 - Work Place Preparation 1-118. Waste Decontamination System 1-126- Engineering Control Lj}'S~127 -Entry/Exit Procedures

1-139 • Enclosure -- 1.129 Maintenance of Barriers LIII 1.138. Encapsulation 1.140 - Glovebag 1.141 - Tent 1 1.1 1 - ACM Disturbance, RemoveL_ Handling

1-146 Preliminary Clean-up ri 1-147 • Final Clean-up Inspection J Project not started revea d all ACM to be intact. New start date: / /_

Protect ongoing, expected completion date: / /

Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on

Samples taken: ~ ' No ' 1 Yes 1 2 3

5 6 Photos taken: Yes j 1; No 4

Additional comments_~}„p e -r a V 1

RESULT CODE

BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND

RESULT CODES I = VIOLATION ISSUED 2 = NO VIOLATION ISSUED z 3 = NO ACCESS SUPER R es~ / 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT C0r(+IPLETED (NO NOV)

NYC-WTC 000107869

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107869Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →