NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report cover sheet, 120 Liberty St

Machine-extracted title · confidence 85%

Cover page of an asbestos inspection report for 120 Liberty Street and 125 Cedar Street indicating a fee exemption status.

NYC-WTC_000107865–000107868

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107865
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0 wi

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN -__ _-- _- - ; - ----.~ APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEKIIN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

I. FACILITY ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 52 LOT: 21

I1. BUILDING OWNER NAME: 120 LIBERTY STREET, LLC Contact TEL. #: ADDRESS. N/A CITY STATE: ZIP

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718) 9614100 FEDERAL EMPLOYER IDENTIFICATION #: P11 ADDRESS: 14 20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME. WKP LABORATORIES; C/O WARREN & PANZER E NYS ELAP #- 11251

ASBESTOS WORK SCHE LU IVi DAY EVENING Ni NIGHT WEEKENDS hC WEEKDAYS

INSPECTOR NAME: CP(Q.l~ ' l NE le ~~ "~• SQUAD #: BADGE #: VIT— a

DATE OF INSPECTION: r Z' TIME OF INSPECTION: From: AM ^ FPM To:H ' AM ! PM Contact at site: 17 O1 8 9 (9

Inspectio sclosed that the following sections were complied with: (Check all thelt apply) 151 Notifications, Reports, Plc 71 Air Sampling and Monitorm Worker Protection 1 1-101 Materials and Equipment 1116. Work Place Preparation I 1.117 - Worker Decontamination System

1-118 Waste Decontamination System 1126. Engineering Controlls jam! 'f127 . Entry/Exit Procedures

1129. Maintenance of Barriers 1.138 - Encapsulation ! 1.139 - Enclosure

1-140 Glovebag 1-141 Tent 1-137. ACM Disturbance, RemoveL, Handling

1.146 . Preliminary Cleanup j 1147 Final Cleanup

Protect not started Inspection revealed all ACM to be intact. New start date: / i 3 -- Project ongoing, expected completion date: f

Project completed on or about / _ / All surfaces, including, abated surfaces are free of visible ACM and encapsulat

Follow up necessary on Samples taken: No Yes 1 2 3

4 5 6 Photos taken: Yes No i Additional comments: OkdALuf • C y ' Sr'r ' 1 ... R~ et -k~ iL t,...s

BORO 1 - MANHATTAN RESUL Dee 2 = BRONX 3 = BROOOKLYN 4 = QUEENS. 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS I SUPERVi INITIA 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107865

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107865Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →