NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/1 PARK ROW 1085949, 90/1
Document / 3 pages

1 PARK ROW 1085949, 90/1

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000115793–000115795
Page image
Scanned page image, NYC-WTC_000115793
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS One Park Row (aka) 1-11 Ann Street ffMMDn0&2/21/03 ZIP >~DRO CODE BLOCK mT °o f Facade SQUAD 1 BADGE # A078

IIN R. BLDG.. TYPE BASIS OF INSPECTION TRUO1 S 8MNO3 PHOTOS TAKEN Yes

CpSPECTORpRS NAM I n oestos it emoval Corp. SAMPLE NO.---------

t- 129 Street CollegePoint SAMPLE NO.--------------------

¶.W lf56 ( Il' E961-4100 SAMPLENO.

ariVenl ' "I D anzer Engineers P.C. MlYffi erprises Ltd. east 45 Street New cnVork R' i° k Row New Cork PHONE 1017 (2''§22-0077 WE 1008 CONTACT PERSON Alan Mishkin TIME OF INSPECTION FROM: 7am _ 3:30pm

INSPECTION DISCLOSED: 02/03/03: Project Manager Tony Costa, Handler Spervisor John Ehlers, Cert#83475 and five handlers from Fiber Control, Inc. and John Burgee of Warren&Panzer were on site. A remote decontamination unit was erceted on the roof . Handlers began cleaning the A/C units and ducts and air sampling was ongoing. At noon the ducts and A/C units cleaning was completed and handlers began cleaning the roof. At 3:30 pm the roof cleaning was completed. 02/20/03: Handler Supervisor John Ehlers and five handlers from Fiber Control, Inc. and Festy Osemwegie of Warren&Panzer came on site and began setting up the dykes on Ann Street side. The boom truck arrived at 7:45 pm and washing of facade began at 8:20 pm.Air sampling was performed. Ann street side was completed at 12midnight and crew departed from the site. 02/21/03: The same crew came on site and began setting up dyke on Park Row and facade washing began at 7:45pm. Air sampling was performed. At 11:30pm facade washing was completed and the crew departed from the site at 12:10am.

Project was completed.

NOV # INFRACTIONS RESULT CODE 5 NOV# SUPERVISORS INmAIS

of DVflV 1 - ~.`ll\L1K1A2%L1 b - DAVl\A J - DflVVl\L 11\ V - %JVL'G1\J J - L LA1L'1\1J14A1\L

BLDG. TYPE A'6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1= Violation Issued 2 = No Violation Issued 3= No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000115793

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115793Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →