Invoice for facade cleaning at 1 Park Row, Feb 2003

Machine-extracted title · confidence 95%

Invoice from Fiber Control Inc. for cleaning 13,050 square feet of facade at 1 Park Row as part of the WTC cleanup program.

NYC-WTC_000115751–000115754

Folder label: “1 PARK ROW 1085949, 90/1”

Page image
Scanned page image, NYC-WTC_000115754
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AeuveTfl YVCPIU'TTnWRRPnRT PAGE 1 OF 1 PREMISE ADDRESS One Park Row (aka) 1-11 Ann Street d0f3D` L0&2/21/03 ZIP ~oRO CODE BLOCK LOT OOI, Facade SQUAD 1 BADGE# A078

PHOTOS TAKEN Yes iNSPECroRR. RAMMOHAN BLDG.. TYPE ass OF INSPECTION TRUO158NIN03 ~p RS — 12~ 8eSL03 emoval Corp. SAMPLE NO.-----

129 Street g"Point Collee SAMPLE No.---------------- --

, SAMPLE NO. 1V Z l f 56 ( I1g P~`06l -4l OO

ar r '&Iuizer Engineers P.C. W° "m ed°1ferprises Ltd. east 45 Street Neg ° 'ork ' 13D k Row New 'fork WE PHONE W 1017 (2h15220077 10 8 Mishkin TIME OF INSPECTION FROM: CONTACT PERSON Alan lam — 3:30„„„

INSPECTION DISCLOSED: 02/03/03: Project Manager Tony Costa, Handler Spervisor John Ehlers, Cert#83475 and five handlers from Fiber Control, Inc. and John Burgee of Warren&Panzer were on site. A remote decontamination unit was erceted on the roof. Handlers began cleaning the A/C units and ducts and air sampling was ongoing. At noon the ducts and A/C units cleaning was completed and handlers began cleaning the roof. At 3:30 pm the roof cleaning was completed. 02/20/03: Handler Supervisor John Ehlers and five handlers from Fiber Control, Inc. and Festy Osemwegie of Warren&Panzer came on site and began setting up the dykes on Ann Street side. The boom truck arrived at 7:45 pm and washing of facade began at 8:20 pm.Air sampling was performed. Ann street side was completed at 12midnight and crew departed from the site. 02/21/03: The same crew came on site and began setting up dyke on Park Row and facade washing began at 7:45pm. Air sampling was performed. At 11:30pm facade washing was completed and the crew departed from the site at 12:10am.

Project was completed.

RESULT CODE NOV # I INFRACTIONS 5 NOV# I I I I I BLDG. TYPE A > 6 STORIES B< 6 S' 'ORIES C SINGLE FAMILY D SCHOOL E 1105 l'ITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 Violation Issued 2 = No Violation Issued 3 = No access 4 - Project not Started (no NOV) 3 = Public Owned Property ACP3093

NYC-WTC 000115754

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115754Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →