NYC 9/11 Public Portal Document
PAGE 1 OF
PRFMISE AnDRESS
14 Wall Street 1V/LO/VLO—
A 12/30/02
H$°ott, Facades ZIP
IORO
CODE BLACK roT 1
SQUAD BADGE a A078
a s?EcroR R. RAMMOHAN BLDG.. TYPE A BASIS OF INsPEcnoN TRU1790MN02
PHOTOS TAKEN Yc
rlonoB o"ssRemoval Corp. SAMPLE
t- 5 129 Street CollegePoint SAMPLE NO.--------------------
if56 (1Y '1 61-4100 SAMPLE NO.
WROKOX1 nzer Engineers P.C. WlYf ``Wall Acquisitions
mast 45 Street NewP'ork 2Wall Street New'Vork
W 1d'17 (25§22-0077 j ZIP PHONE
CONTACT PERSON Ravi Dindayal, Chief Engineer n OF INSPECTION FROM: 8 am _5 pm_
INSPECTION DISCLOSED:
10/26/02 : Jan Wolkovicz and Five handlers began setting up the decon on the roof and began cleaning various
spots of the roof. Air monitoring was perfomed by Warren&Panzer.
10/27/02: The crew continued the cleaning in the roof and completed the roof at the end of the day.
11/30/02: Jan wolkovicz and six handlers came on site and setup scaffoldings on the 10th floor setback. Decon was
setup at 10th floor for the exterior facade clean up,Two windows and ledges fo two facades facing east and west
were completed. Oghogho performed air sampling.
12/01/02: Jan Wolkovicz and four handlers from Trio and Oghogho Erhaber of W&P on site. A large scaffolding
was utilized to clean window s and ledges. At the end of the day that facade facing pine street was completed.
12/14/02: Jan Wolkovicz and six handlers and Festy Osemvegie of W&P were on site. Two scaffolds on Nassau
Street were up on the facade for windows and ledges cleaning. Cleaning started from the 18th floor since cables
were dropped from the vacant 19th floor. Debri observed only from 19th and down on ledges. Cleaning was done
up
to 8th floor at the end of the day.
12/15/02: The same crew came on site and continued cleaning and the cleaning was completed at the end of the day
for that facade.
12/21/02: Jan Wolkovicz and six handlers and Festy Osemvegie were on site. Two scaffolds were ready for the
facade of the pyramid building on wall street. Handlers began cleaning window and ledges from 18th floor and
down. Cleaning was done up to 7th floor at the end of the day.
12/22/02: The same crew continued the cleaning on facade. At the end of the day facade cleaning was completed
and the scaffolds were dismantled. Crew vacuumed the ledges of 19th floor on Wall and Nassau Street sides.
12/30/02: Jan Wolkovicz and four handlers came on site to clean the facade west of main entrance on Wall street
from floors five and down where debris observed. A Genie manlift was utilized and the work was started at 6pm
and completed at 12:30am. This completes the project in the entire building.
Project Completed.
NOV M I INFRACTIONS RESULT CODE
NOV0
a
BLDG. TYPE A >6 STORIES B< 6 STORIES C SINGLE FAMILY
D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY
RESULT CODES I = Violation Issued 2 = No Violation Issued 3 = No access
4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093
NYC-WTC 000112193