Asbestos Inspection Report Page 1 of _1
Premise # Date of Inspection
10-12 Maiden Lane 07/20/2002 & 07/20/02
Floor Zip Block Lot # Born Code
Roof & facade 10006 19 11 1
Inspector Badge # Squad # Basis of Inspection Building Type Pictures
Rammohan A078 1 A yes
Contractors Name Sampled
Trio Asbestos Removal Corp. NA
Address Sample #
14-20 129 Street NA
City State Zip Sample #
College Point NY 11356 NA
Laboratory Name Building Owner
Warren & Panzer 10-12 Maiden Lane LLC
Address Address
228 East 45Th Street
City State Zip City State Zip
NY NY 10017
Contact Person At Site Time of Inspection
Marek J Trzepietowski - Project manager Sam -8 pm
On arrival Inspection disclosed before the project could begin we had to contact NYDP, OEM & DOT to have
four vehicles towed. The Warren & Panzer representative was Gregegor Boron (7/20/02) & Cheetram Ramraj
(7/21/02). The roof cleaning began first followed by the facade. A remote decontamination system was built on
the 2 nd floor. There were four small roofs at the lower level, which were also addressed. Later in the day a dike
was built on the sidewalk and cleaning started on the facade. Work went ahead as scheduled. The site was
monitored by Dennis Antzoulatos, Dennis White, and Carlstien Lutchmedial.
On 7/21/02 cleaning continued with DEP requesting more cleaning in some areas. A final was performed on
the roof and facade and it was found to be free of WTC debris.
NOV # Result Code
NA 5
NOV # S sec '
NA
llioro Code i = iviannaaan L = nronx s = nroo iyn '1= queens D = aiaten isiau
Bldg. Type A> 6 Stories B <6 Stories C - Single Family D - School
E - Hospital F — Public Owned Property
Result Codes 1= Violation Issued 2 = No Violations Issued 3 = No Access
4 = Project Not Started 5= Project Completed
NYC-WTC 000101918