Air sample results and clearance letter, Warren & Ward, July

Machine-extracted title · confidence 50%

A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.

NYC-WTC_000100831–000100838

Folder label: “114 LIBERTY STREET 1001041, 52/7502”

Page image
Scanned page image, NYC-WTC_000100838
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report Page 1 of _I Premise # Date of Inspection 114 Liberty Street 07/20/2002 & 7/21/02 Floor Zip Block Lot # Boro Code Facade 10006 19 11 1 Inspector Badge # Squad # Basis of Inspection Building Type Pictures Rammohan A078 1 2u I o4 0 MM o 2 A yes Contractors Name Sample # Trio Asbestos Removal Corp. NA Address Sample # 14-20 129 Street NA City State Zip Sample # College Point NY 11356 NA Laboratory Name Building Owner Warren & Panzer 1 Address Address 228 East 45Th Street City State Zip City State Zip NY NY 10017 Contact Person At Site Time of Inspection Marek J Trzepietowski — Project manager 8am — 8pm On arrival Inspection disclosed The north facade cleaning started at 8 am on 7/20/02 with the use of a bucket truck and two handlers the supervisor on site was Sasa Simic and air monitor from Warren & Panzer — Dipo Elemo AH- 01-14694. Prior to starting the sidewalk bridge was plasticized, a dike formed appropriate filtration devices in place, and a remote decontamination was placed on the roof of the building. The site was monitored by Dennis Antzoulatos, and Carlstien Lutchmedial.

A final visual inspection was performed on the roof and facade and it was found to be free of WTC debris.

On 7/21/02 the south side facade was started. And clean up went ahead as scheduled. On requesting a final inspection DEP noted areas that required more cleaning. This was later done and Carlstien Lutchmedial re- inspected and found that there was no visible WTC debris. As of today the roof and facade has been cleaned.

NOV # Result Code NA 5 NOV # Supe sor Initial NA Boro Code 1 = Manhattan 2 = Bronx 3 = Brooklyn 4 = Queens 5= Staten Island Bldg. Type A > 6 Stories B <6 Stories C - Single Family D - School E - Hospital F — Public Owned Property Result Codes 1= Violation Issued 2 = No Violations Issued 3 = No Access 4 = Project Not Started 5 = Project Completed

NYC-WTC 000100838

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100838Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →