NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/60 PINE STREET 1001008, 41/15
Document / 5 pages

Asbestos inspection report for 60 Pine Street, July 2002

Machine-extracted title · confidence 95%

Report summarizing the scope and findings of an asbestos inspection conducted on the roof and facade of the building.

NYC-WTC_000114893–000114897

Folder label: “60 PINE STREET 1001008, 41/15

Page image
Scanned page image, NYC-WTC_000114897
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report Page 1 of _1 Premise # Date of inspection 60 Pine street 07/14/2002 Floor Zip Block Lot # Boro Code Roof& facade 10006 19 11 1 Inspector Badge # Squad # Basis of Inspection Building Type Pictures Carl Lutchmedial A058 1 TRU0861MN02 A yes Contractors Name Sample # Trio Asbestos Removal Corp. NA Address Sample # 14-20 129 Street NA City State Zip r Sample # College Point NY 11356 NA Laboratory Name Building Owner Warren & Panzer Downtown Association Address Address 228 East 45Th Street 60 Pine St City State Zip City State Zip NY NY 10017 NY NY 10005 Contact Person At Site Time of Inspection Joe Bonder —Project Manager 8 am - 8 pm On arrival Inspection disclosed workers were setting up the rigging for the north facade (20 Cedar st). At the same time workers were building a dike along the sidewalk. On the roof, work was continuing on the set back (HVAC) area. Plastic was laid on the roof top to collect run off. This area had large accumulations of pigeon droppings which had become embedded in some of the surfaces. Some of the window ledges also had concrete splatters which gave the appearance of debris from a distance. There were one supervisor for the roof Jan Wolkowicz # 84919 and one for the facade, Sasa Simic. A air monitor from Warren & Panzer — Dipo Elemo AH- 01-14694. Work went ahead as scheduled. At the end of the day, a final visual was performed and the areas were found to be free of WTC debris. Project is completed.

NOV # I I Result Code NA I I 15 NOV # Supervisor Innitial NA ~P Boro Code I = Manhattan 2 = Bronx 3 = Brooklyn 4= Queens 5 = Staten isliana Bldg. Type A> 6 Stories B <6 Stories C - Single Family D - School E - Hospital F — Public Owned Property Result Codes 1= Violation Issued 2 = No Violations Issued 3 = No Access 4= Project Not Started 5 = Project Completed

NYC-WTC-000114897

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000114897Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →