NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 39/62 WILLIAM STREET; 1001013, 41/24
Document / 1 page

62 WILLIAM STREET; 1001013, 41/24

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000110312
Page image
Scanned page image, NYC-WTC_000110312
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PkbTECTION TOTAL FEET: 7600 0 ASBESTOS INSPECTION REPORT Basis of Inspection: FL SF LF IRO 7.600 0 TRU MNii1 ONLY TYPEWRITTEN FEE EXEMPT: Yes APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1 • $0.00 OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: 1O/V1 0002 COMPLETION DATE: -Z' ; J2002

L FACILITY / ADDRESS: (OZ UJ#4'.~ j 'rj BORO: MANHATTAN ZIP: TYPE OFFACILITY: BLOCK: LOT:

II. BUILDING OWNER NAME: N/A TEL. I: ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORP - FEDERAL EMPLOYER IDENTIFICATIONS PI . . ( TEL. 5: (7181 961-4100 ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: NY ZIP: 11366

V. THIRD PARTY AIR MONITOR NAME: WAREN & PANZER GROUP TEL. 0: ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER NYS ELAP S: 11251 ASBESTOS WORK SCHEDULE I] DAY ® EVENING ❑ NIGHT ® WEEKENDS ® WEEKDAYS

INSPECTOR NAME: R . Re 7 h 4 +'7 SQUAD 5: j BADGE is 7 f~

DATE OF INSPECTION: 10 02 .o2 o2 TIME OF INSPECTION: From: am. AM PM lC 13JO2 7 JO/al, / 0/23. To: S p . AM PM Contact at site:

Inspection disclosed that the following sections were complied with: (Check all that apply) 1-51 - Notifications, Reports, Plan 1-71 - Air Sampling and Monitoring = 1-91 - Worker Protection

1-101 - Materials and Equipment 0 1-116 - Work Place Preparation [J 1-117 - Worker Decontamination System

1-118- Waste Decontamination System 1-126 .Engineering Controls 1-127 - Entry/Exit Procedures

1-129 - Maintenance of Barriers 1-138 - Encapsulation 1-139 - Enclosure

1-140 - Glovebag 1-141 -Tent 1-137 -ACM Disturbance, RemoveL, .Handling

1-146 - Preliminary Clean-up a 1-147 - Final Clean-up Project not started . Inspection revealed all ACM to be Intact. Now start date: /

Project ongoing, expected completion date:

Project completed on or about: / - All surfaces, including abated surfaces are Nee of visible ACM and encapsulate Follow up necessary on Samples taken: No Yes 1 2 3 4 5 8 Photos taken: a Yes ® No Additional comments: / p 02 s'i /e/pI/Co i$c vL4 C7 ei..! Y1 cDD1 I rw . 2>l o (eIrra . Y- oYti c faY • ytZ C sit

lc4i2Io C c4.- ie C

txhsa Co» - t te4 ar.a4 ccrrnple.Md t e-.4

21 02' 0.0 e -'vex (ko P?.W Dtpo cde (a-'. C Q G e m wczss RESULT CODE BORO I = MANHATTAN 2 . BRONX 3 = BR000 LYN 4 = QUEENS 5 Q STATEN ISLAND RESULT CODES 1 Q VIOLATION ISSUED 2 - NO VIOLATION ISSUED 3 - NO ACCESS SUrERVISOR INMALS 4 = PROJECT NOT STARTED (NO NOV) 6 - PROJECT COMPLETED) (NO NOVI

NYC-WTC 000110312

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000110312Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →