NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/94 1/2 GREENWICH ST.
Document / 4 pages

Invoice for roof cleanup, 94 1/2 Greenwich Street, Nov 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp for roof cleanup services at 94 1/2 Greenwich Street dated November 27, 2002.

NYC-WTC_000128516–000128519

Folder label: “94 1/2 GREENWICH ST.

Page image
Scanned page image, NYC-WTC_000128519
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

A ti NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 7600 0 ASBESTOS INSPECTION REPORT Basis of inspection: FL sF LF aYcrlrrtwwrrEa TRU1t•4tMNO2 RO o APPLIC CONS *XL W NOTE: ASBESTOS•INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes „c4g f qy o/O ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. 80.00 OF START OF THE WORK (ABATEMENT ACTMTIES) START DATE: ///Afoo2 COMPLETION DATE- //F// 2OO2 L FACILITY ADDRESS: BORO: MANHATTAN ZIP: TYPE OFFACIUTY: BLOCK: LOT: II. BUILDING OWNER NAME: N/A TEL B: ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368 N. ASBESTOS ABATEMENT CONTRACTOR r• NAME: TRIO ASBESTOS REMOVAL CORP TEL. 5: /: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATIONS: P11 ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: NY ZIP: 11358 V. THIRD PARTY AIR MONITOR NAME: WAREN & PANZER GROUP TEL B: ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE ® DAY ® EVENING ❑ NIGHT ® WEEKENDS ® WEEKDAYS

INSPECTOR NAME: R. R tr-rkse SQUADS: / BADGES: /Qdy~ /'/.2 6/O21' DATE OF INSPECTION: TIME OF INSPECTION: From: AM 0 PM To: AM PM Contact at site: SYG~112dta_ r,~o nr:3!i~ X422® / , i... i. - ter_•s.- . . Inspection disclosed that the following sections were complied with: (Check all that apply) 1-51 - Notifications, Reports, Plan 1-71 - Air Sampling and Monitoring fl 1-91 - Worker Protection 1-101 - Materials and Equipment a 1-116 - Work Place Preparation 1-117 - Worker Decontamination System [] 1.118- Waste Decontamination System a 1-126 - Engineering Controls Q 1.127 - Entry/Exit Procedures 1-129 - Maintenance of Barriers 1-138 - Encapsulation 1.139 - Enclosure 1-140 - Glovebag Q 1-141 -Tent a 1-137 -ACM Disturbance, RemovaL .Handll ng 1-146 - Preliminary Clean-up 1-147 - Final Clean-up Project not started - Inspection revealed all ACM to be intact. New start date: /

I Project ongoing, expected completion date: / Project completed on or about: / . Al surfaces, Including abated surfaces are free of visible ACM and encapsulate Follow up necessary on / / Samples taken: No Yee 1 2 3 4 5 8 Photos taken: D Yes No Additional comments: ! v d2 , e4 Lepy b..af

4r mw?

t Zo - tl<~t tt Q. M~ Ltnu - t

fO 2 wta

RESULT CODE BORO I = MANHATTAN 2 - BRONX 3 e BROOOKLYN 4 = QUEENS 5 - STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 - NO VIOLATION ISSUED 3 - NO ACCESS save am us 4 - PROJECT NOT STARTED (NO NOV) 5 - PROJECT COMPLETED (NO NOVI

NYC-WTC 000128519

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128519Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →