NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/11 RECTOR ST 1000800, 19/21
Document / 4 pages

11 RECTOR ST 1000800, 19/21

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000113847–000113850
Page image
Scanned page image, NYC-WTC_000113847
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

✓~' ~os-~~T~ N (RONMENTAL PROTECTION ~;o?~ •- — *~.,. • Asbestos Control Program ~ \ g; 59-17 Junction Boulevard. 8th Floor, Corona, NY 11368-5107 Building Dc or TRIJ No J FOR OFFICIAL USE ONLY ONLY ~~ / ! TYPE TeRO ASBESAOE P NOTIFICATION FORMSRWILLEBE~="w'"~u! ems ( B S SPECTON~E 1. ACCEPTED t ••~••r..z..ra.o (S fee schedule)

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .

I. FACILITY 1 1 Rector Street BoroughManhattan Zip 10006 2. Address

AKA 3. Block 19 4. Lot 2 1

5. Type of Facility__ 6. Name of Building

II. BUILDING OWNER

7. Name Andrew J. Spyreas 8. Contact Person

9. Tel. # Fax #

10. Address City State Zip

III. GENERAL CONTRACTOR

11. Name TeL #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14. Federal Employer ID. #._._._._._._.P1! ._._._._._._. 15. Tel. # 71 8 9 61- 41 0 0 Fax# 718-961-4103 16. Address 1 4-20 129th Street cityCollege Point State NY Zip 1 1 356

V. THIRD PARTY AIR MONITOR

17. NameWarren & Panzer Engineers, P.C. 18. Contact PersonMichael Nolan

19. Federal Employer ID. # 20. Tel.# 212-922-0077 Fax# 212-922-0630 21.Address 228 East 45th Street CityNew York State NY Zip 10017 22. Sample Analysis LaboratoryWar.ren & Panzer Engineers 23. NYS DOH ELAP # 1 1 251

VI. PROJECT INFORMATION

24. Starting date for this portion of work L ~+ A ,/ Z Projected completion date '7/ 79 / e

Asbestos work schedule VK onday uesday Vdnesday t a -Thursday 'Friday (Saturday iunday

Shift from: Earn pI to Dam [m 3 !,

If other, J' specify _

Access to inspect the premises must be provided during the work schedule indicated in this item. JUN~~ CP 2 7 2002 25. Total amount of asbestos-containing material to be abated during this work pEP~ftAllf}fM V 3, 600 Square Feet, and/or Linear Feet °ROGRAM'~. Tf2

1

NYC-WTC 000113847

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000113847Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →