NYC 9/11 Public Portal Document

os-? N tRERRW~y o NMENTAL PROTECTION /~ r icr T ) Y•~ t~ --•--oinavr~,;. Asbestos Control Program ri`i ® t•~ \` 1 59-17 Junction Boulevard, 8n' Floor, Corona. NY 11368-5107 Building Deb or TRU No ONLY . JJ ASBESTOS PROJECT NOTIFICATION FOR OFFICIAL USE ONLY TYPEWRITTEN t4 -. ~2` FORMS WILL BE ~"" !"O (ASBESTOS INSPECTION REPORT) ACCEPTED f «•«.■rc.ae~/d.e (S a fee schedule)

When submitting this form at. the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .

1. FACILITY

2. Address 11 Rector Street _ BoroughManhattan Zip 1 0006 AKA _ 3. Block 19 4. Lot 21

5. Type of Facility _ 6. Name of Building

II. BUILDING OWNER

7. Name Andrew J. Spyreas 8. Contact Person

9. Tel.# Fax#

10. Address — City State Zip

Ill. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos Removal Corp. 13. Contact PersonChris Horan

14. Federal Employer ID. #__ _P~! _; 15. Tel. #71 8-961-4100 Fax# 718-961-4103

16.Address 14-20 129th Street cityCollege Point State NY zip11356

V. THIRD PARTY AIR MONITOR P.C. 18. Contact Persont4 chael Nolan 17. NameWarren & Panzer Engineers, 212-922-0077 Fax# 212-922-0630 19. Federal Employer ID. # 20. Tel. #

21.Address 228 East 45th Street CityNew York State NY Zip 10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 11 251

VI. PROJECT INFORMATION L 24. Starting date for this portion of work Projected completion

Asbestos work schedule 4onday 'TGTuesday CV dnesday hursday }''Friday Saturday) unday

Shift from: Elam to j Dam LAM 3l 4 Tr"' If other, specify —

Access to inspect the premises must be provided during the work schedule indicated in this item. JUN 272002 25. Total amount of asbestos-containing material to be abated during this work 3, 600 Square Feet, and/or Linear Feet ?UG ACP 7 gaol

NYC-WTC 000113849

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000113849Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →