NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/94 1/2 GREENWICH ST.
Document / 4 pages

Invoice for roof cleanup, 94 1/2 Greenwich Street, Nov 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp for roof cleanup services at 94 1/2 Greenwich Street dated November 27, 2002.

NYC-WTC_000128516–000128519

Folder label: “94 1/2 GREENWICH ST.

Page image
Scanned page image, NYC-WTC_000128517
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i 9 )Li TC • NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION • +~"" ' +r~ + Asbestos Control Program '- ,74JO;2j /ny 59-17 Junction Boulevard, 8" Floor, Corona, NY 11388-5107

ASBESTOS PROJECT NOTIFICATION FORMS WILL BE (ASBESTOS INSPECTION REPORT) 1. rww.a e. ar as ACCEPTED

When srdxrdtting tNs.farm at the NYC Department of BuikBngs, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original sues. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement ac tMtles . 1. FACILITY 2. Adder 941/2 GREENWICH STREET Borough Manhattan Zip _

AKA _ 3. Block 4. Lot

5. Type of Facility 6. Name of Building 11. BUILDING OWNER 7. Name 8. Contact Person

9. Tel.# Fax#

10. Address City State Zip

IIL GENERAL CONTRACTOR 11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name TRIO ASBESTOS REMOVAL CORP. 13. Contact Person STEVEN PARMIGIANI

14. Federal Employer ID. i ._._._._._._._._. P _ _ _ _ _ _ . 15. Tel. # (718) 961-4100 Fax# (718) 961-4103 City COLLEGE POINT State NY Zip 11356 16. Address 14-20 129 STREET V. THIRD PARTY AIR MONITOR 18. Contact pew MIKE NOLAN 17. Name WARREN & PANZER ENGINEERS, P.C. 19. Federal Employer ID. #_______________ 20. Tel. # (212) 922-0077 Fax# (212) 922-0630

21. Address 228 EAST 45 STREET City NEW YORK ' State NY Zip 10017

ENGINEERS, P.C. 23. NYS DOH ELAP # 11251 22. Sample Analysis Laboratory WARREN $PANZER VL PROJECT INFORMATION 24. Starring date for this portion of wank f D7 2 Projected completion date / i 7/02.

Asbestos work schedule El Monday El Tuesday ® Wednesday © Thursday © Friday 0 Saturd , S1day

Shift from: 8:00 ® am D pm to 8:00 Dam ® pm If other, specify Access to Inspect the premises must be provided durkrg the work schedule Indicated In this hem.

25. Total amount of asbestos-containing material to be abated during this work 1,920 Square Feet, and/or _0 Linear Feet

NYC-WTC 000128517

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128517Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →