Asbestos removal invoice, 96 Greenwich Street, Nov 2002

Machine-extracted title · confidence 100%

Invoice from Asbestos Removal Corp for roof cleanup services at 96 Greenwich Street dated November 27, 2002.

NYC-WTC_000128480–000128483

Folder label: “96 GREENWICH STREET 1001056, 53/39

Page image
Scanned page image, NYC-WTC_000128481
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2,2V ' QT C- ¢ NYC DEPARTMENT a ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard, 8" Floor Corona, NY 11388.5107

ASBESTOS PROJECT NOTIFICATION , •~PO /3`_ (ASBESTOS INSPECTION REPORT) ..`.d ~ 4 4t C TED with original When submitting this form at the NYC Department of Buildings, the original form and twee (3) ooples signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. The form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

I. FACILITY 2. Address 96 GREENWICH STREET Borough Manhattan Zip

3. Block - 4. Lot rfi 5. Type of Facility 6. Name of Building

I1. BUILDING OWNER

7. Name 8. Contact Person

9. Tel. # Fax #

city State Zip 10. Address

Ill. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name TRIO ASBESTOS REMOVAL CORP. 13. Contact Person STEVEN PARMIGIANI

14. Federal Employer ID. #--_-_-_-_-_-_-_-_--- I -15. Tel. # (718) 861-4100 Fax # (718) 961-4103

16. Address 14-20129 STREET City COLLEGE POINT State NY Zip _11356

V. THIRD PARTY AIR MONITOR ENGINEERS, P.C. 18. Contact person MIKE NOLAN 17. Name WARREN & PANZER 19. Federal Employer 1D. # 20. Tel. # (212) 822-0077 Fax # (212) 922-0630

21. Address 228 EAST 45 STREET City NEW YORK ' State NY Zip 10017 PANZER ENGINEERS, P.C. 23. NYS DOH ELAP # 11251 22. Sample Analysis Laboratory WARREN & VL PROJECT INFORMATION 24. Starting date for this portion of work __ 7 D x- Projected completion date // /7 a L

Asbestos work schedule 0 Monday 0 Tuesday 0 Wednesday 0 Thursday 0 Friday 0 Saturday Sunday

Shift torn: 8:00 0 am ❑ pm to 8:00 ❑ am 0 pm ~ L&IT

If ems' r /, G' [Accessk h>specf the prerrIlaes „mot ve prrndded dry the n~ork schedule kidkated In Ws item. rl'0~/ 8 25. Total amount of asbestos-containing material to be abated during this work \.. 3,420 square Feet, and/or 0 Linear Feet AP 7 22001

NYC-WTC 000128481

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128481Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →