ASBESTOS INSPECTION REPORT Basis of Inspection: Ft:1 F
roof 4,550 0
ONLY TYPEWRITTEN roof j TRU1047MN02 3,300 , 0
APPLICATIONS WILL BE • NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes roof 900 . 0
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00 roof 1,250 0
OF START OF THE WORK (ABATEMENT ACTIVITIES) yar 4,4101 0
aqa 5,625 i 0
START DATE: 7/8/02 COMPLETION DATE: 7/30/02 a a 5,625 1 0
I. FACILITY
ADDRESS: 60 PINE STREET BORO: MANHATTAN ZIP: 10005
TYPE OFFACILITY: BLOCK: 41 LOT: 15
I1. BUILDING OWNER ✓ r
NAME: DOWNTOWN ASSOCIATION
TEL., #: (212) 422.1982
ADDRESS: 60 pine street CITY: ny STATE: ny ZIP: 10005
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION # : P11
ADDRESS: 14-20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922.0077
ADDRESS: 228 EAST 45TH STREET CITY:NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE N' DAY EVENING NIGHT ✓f WEEKENDS V' WEEKDAYS
INSPECTOR NAME: R RPrm mu1 l&'I SQUAD #: i BADGE #: 478
DATE OF INSPECTION: `7 / // X02 TIME OF INSPECTION: From: Q vi.c AM j PM
To: AM PM .
Contact at site: 5'?1e-v
ParYhctdcaK~~ FY!)
Inspection disclosed that the following sections were complied with: (Check all that apply)
I 1.51 • Notifications, Reports, Pla j 1.71 - Air Sampling and Monitorin 1-91 - Worker Protection
1.101 - Materials and Equipment 1.116 -Work Place Preparation 1-117 -Worker Decontamination System
1-118 -Waste Decontamination System 1.126- Engineering Controls 1-127- Entry/Exit Procedures
1-129- Maintenance of Barriers 1.138 - Encapsulation j 1-139 - Enclosure
1.140- Glovebag ; 1-141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling
1.146 - Preliminary Clean-up 1-147- Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat'!
i Follow up necessary on
Samples taken: No ! Yes 1 2 3
4 5 6 Photos taken: Yes No
Additional comments:
fce r/ WO/~ Wic?,. ci.-t ve de 4,rs S 2*/eE a2 ~e
/e~ -/ ' c/ccr v-.c uur►r.~~ ~i-4 c .
' f i7 1
pZ.e. cf,eu wee c e.s- P mot.a0 w - L1 t- wc.a
i RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
` -
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS
SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) - f[p V