NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 6050 0
• ASBESTOS INSPECTION REPORT Basis of Inspection:
roof 3,000 _ 0
ONLY TYPEWRITTEN
TRU098OMN02 ! ----_ 0
_. . . - - - -- - - -- -
APPLICATIONS WILL BE ; NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED -FEE EXEMPT: Yes ' 0 0
ACCEPTED all , 800 ! 0
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE j 1. $0.00 -
OF START OF THE WORK (ABATEMENT ACTIVITIES) 0 0
0 0
START DATE: 7/1/02 COMPLETION DATE: 7/31/02 aca,
2,250 0
I. FACILITY 0 0
ADDRESS: 44 NEW STREET BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: 24 LOT:
II. BUILDING OWNER
NAME: N/A
TEL.#:
ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: PII
ADDRESS: 14.20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922.0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE ✓' DAY - EVENING NIGHT WEEKENDS Y WEEKDAYS
INSPECTOR NAME: R' R,i))7J1h 4l SQUAD #: / BADGE #: ?~
DATE OF INSPECTION: 7 /.2gr /O2- TIME OF INSPECTION: From: AM PM
To: AM PM
Contact at site: 1
}~ A hn - /3O rr
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 - Notifications, Reports, Pla 1 1-71 - Air Sampling and Monitorin 1-91 - Worker Protection
1.101 - Materials and Equipment 1.116. Work Place Preparation 1.117 - Worker Decontamination System
1-118 - Waste Decontamination System 1.126- Engineering Controls 1.127 - Entry/Exit Procedures
1.129 - Maintenance of Barriers 1.138 - Encapsulation 1.139 - Enclosure
1.140 - Glovebag J 1.141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling
1.146- Preliminary Clean-up 1.147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date: / /
Project ongoing, expected completion date: / /
Project completed on or about 7/ 2 g- /Q yAll surfaces, including abated surfaces are free of visible ACM and encapsulat
h
Follow up necessary on / /
Samples taken: No Yes 1 2 3
4 5 6 Photos taken: Yes No
Additional comments:
--T dam'_
w e fo -t cak-- .. 7tuz bok» /- tc' 1
U/sv 4
ti- y7Z etJaL> rne,Q C lize c.-f' CoNi let 7D72.
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS suPERv sogwinaLs
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) V~/~/ •
/
NYC-WTC 000098689
OCR can misread numbers and units. Confirm readings against the page image before using them.