NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 25660 0
ASBESTOS INSPECTION REPORT Basis of Inspection:
roof 4,550!
TRU1047MN02 ! roof 0
ONLY TYPEWRITTEN 3,300 0
APPLICD NS fNILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes roof 900 0
A
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00 roof i 1,250 0
OF START OF THE WORK (ABATEMENT ACTIVITIES) cyar 4.410' 0
aca. 5,625 0
START DATE: 7/8/02 COMPLETION DATE: 7/30/02 a a 5,625 0
I. FACILITY
ADDRESS: 60 PINE STREET BORO: MANHATTAN ZIP: 10005
TYPE OFFACILITY: BLOCK: 41 LOT: 15
II. BUILDING OWNER ✓ r
NAME: DOWNTOWN ASSOCIATION
TEL. #: (212) 422.1982
ADDRESS: 60 pine street CITY: ny STATE: ny ZIP: 10005
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: i PI
ADDRESS: 14-20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922.6077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE Idl DAY 'I EVENING 4' NIGHT IV WEEKENDS 4' WEEKDAYS
INSPECTOR NAME: R R 4 17yyw/t LwT SQUAD #: t BADGE #: 40 72
DATE OF INSPECTION: 7/ /2. / 0 y TIME OF INSPECTION: From: tu"-- AM PM
To: Gj 7 AM PM
at site: Jr' tie P ti+ luc;~u rt doe /~~n.~l~r , , r f
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 - Notifications, Reports, Pla 1-71 - Air Sampling and Monitorin 1-91 - Worker Protection
1-101 - Materials and Equipment 1-116 - Work Place Preparation 1-117 - Worker Decontamination System
1-118 -Waste Decontamination System 1-126 - Engineering Controls 1-127 - Entry/Exit Procedures
1-129 - Maintenance of Barriers 1.138. Encapsulation 1.139 - Enclosure
1.140 - Glovebag 1.141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling
1-146 - Preliminary Clean-up I 1-147- Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on / /
Samples taken: 'V No Yes 1 2 3
4 5 6 Photos taken: ! Yes No
Additional comments: -
WO/ ,w?c si s c- +// -
~:ya leh-to Xu-r~ P , ,~.s. w ~~ fr ecL A
RESULT coos
BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND !
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) i l
NYC-WTC 000114894
OCR can misread numbers and units. Confirm readings against the page image before using them.