• NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 25660 0
• ASBESTOS INSPECTION REPORT Basis of Inspection:
of 4,550
OAILYTYPEWRITTEN ---_- _-.. _ . . . .- -- . _-__ _
TR111047MN02 roof 3,300 0
-. - FEE EXEMPT- Yes roof
NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 900 0
ACCEPTED 1. $0.00 roof 1,250 0
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES) ar 4,410 _ _0
aga 5,625 0
START DATE: 7/8/02 COMPLETION DATE: 7/30/02 a a 5,625 0
1. FACILITY
ADDRESS: 60 PINE STREET BORO: MANHATTAN ZIP: 10005
TYPE OFFACILITY: BLOCK: 41 LOT: 15
11. BUILDING OWNER
NAME: DOWNTOWN ASSOCIATION
TEL. #: (212) 422.1982
ADDRESS: 60 pine street CITY: ny STATE: ny ZIP: 10005
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION ----------------'-'-'-'-'-'-'-'-'-'I
l_______P--
TEL.#: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION#:
ADDRESS: 14.20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE h/l DAY EVENING V NIGHT WEEKENDS 10 WEEKDAYS
SPECTOR NAME: /. RQ/r/'7m 6."- . SQUAD #: / BADGE #: Ap ~•
kTE OF INSPECTION: 7/ /C 2 — TIME OFINSPECTION: From: 8 AM PM
To: 8 AM PM
intact at site: ~I 4 ~JqA
j77io-
Inspection disclosed that the following sections were complied with: (Check all that apply)
1.51 - Notifications, Reports, Pla I 1-71 - Air Sampling and Monitorin 1-91 - Worker Protection
1-101 -Materials and Equipment j 1.116 • Work Place Preparation j 1.117 - Worker Decontamination System
1.118 -Waste Decontamination System [ 1 1.126 - Engineering Controls 1.127 - Entry/Exit Procedures
1-129. Maintenance of Barriers [ 1 1-138- Encapsulation j 1-139 - Enclosure
1.140 - Glovebag j 1.141 - Tent 1-137 - ACM Disturbance, RemoveL, Handling
1.146 - Preliminary Clean-up i j 1.147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about 7/ / /o2.- All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken: No I Yes 1 2 3
4 5 6 Photos taken: I Yes No
Additional comments: CIP er T ( ~ d ~ 0M j
cl C
- ~'Y2. ✓,# 2 S ~tXCt - Si /Yt a d 1su.Y kcwd te~rs.
SD L.- .c o 9 J caQ. 4i arts I,
- '.Q-AQ s~.te49 a tk &E LQ 8s3a e 4 &tr2 f'V
. --
RESULT CODE-
BORO 1 = MANHATTAN 2= BRONX 3= BR000KLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES I = VIOLATION ISSUED 2= NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) e