NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: ,TL I SF 1 is
roof l 5,509 ; 0
• __ _ _— _ -
TRU1103MN02 a a 7,169 0
ONLYTYPEWRITTEN SUBMITTED FEE EXEMPT: Yes
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE
ACCEPTED 1• $0.00
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERT STREET/113.117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER
NAME: BALDWIN REALTY, C/O CHARLES GANLER
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION #: PII
ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922.0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN& PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE rl DAY V EVENING NIGHT h/ WEEKENDS WEEKDAYS
INSPECTOR NAME: 2. RO /Y77 Y/ LO SQUAD #: — BADGE #: 4o' jg'
,7 Zr TIME OF INSPECTION: From: caw AM PM
DATE OF INSPECTION: / /O2
To: (o AM PM
Contact at site: S~~ S'i m i c _~~ O S_~~._~r»-o ~~'
Inspection disclosed that the following sections were complied with: (Check all that apply)
1.51 - Notifications, Reports, Pla 1 1.71 •Air Sampling and Monitorin I 1-91 -Worker Protection
1.101 Materials and Equipment 1.116 • Work Place Preparation I 1.117. Worker Decontamination System
LJ
1.118 Waste Decontamination System j 1.126 - Engineering Controls I J 1.127 - Entry/Exit Procedures
- - --
I i 1.129. Maintenance of Barriers 1.138 Encapsulation Li 1-139 -Enclosure
L1
1 1140 t 1.141 - Tent ~~ 1.137 - ACM Disturbance, RemoveL, Handling
1
1-140 . Glovebagina Clean-up 1.147 • Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date:
1 Project ongoing, expected completion date:
Project completed on or about 7/ 21 /o I surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on
Samples taken: No [i Yes 1 ___________2
— — -- 3_ ---- —_—
4 5 6 Photos taken: j Yes No
Additional comments: {=•~1 C ~•ewri ~ ltd ~/tr4
-- -- -- ~r-cw_—~
__ad2r cleo.w _ ....... ...R.p4_~~ Ilea-
- -- -H
_ a
RESULT CODE
BORO 1 = MANHATTAN 2= BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND I
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS suRERviso wnnLs
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000100578