NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: FL SF I LF
roof 5,509 1 0
I TRU1103MN02 !
ONLYTYPEWRITTEN , aca 1 7,169 0
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERIISTREET/113.117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER
NAME: BALDWIN REALTY, C/0 CHARLES GANLER
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL #: (718) 961 4100 FEDERAL EMPLOYER IDENTIFICATION # : PII
ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE V, DAY !V EVENING i NIGHT Id! WEEKENDS hI WEEKDAYS
INSPECTOR NAME: ~. PD'rn Y -Lo hL _ SQUAD #: I BADGE #:
DATE OF INSPECTION: 7/ IS /02 TIME OF INSPECTION: From: ' '.'w1 AM PM
To: ~ r-yyt AM PM
Contact at site: ~+_
~qa4,, 5' m i p //-v .s c -v o /
:o / ,- pY'o~ c i cl
Ldj S
Inspection disclosed that the following sections were complied with: (Check all that apply)
1.51 - Notifications, Reports, Pla 1-71 - Air Sampling and Monitorin i 1-91 - Worker Protection
1101 - Materials and Equipment 1-116 Work Place Preparation 1-117 - Worker Decontamination System
1-118 -Waste Decontamination System 1-126 -Engineering Controls 1-127 - Entry/Exit Procedures
1-129 Maintenance of Barriers 1-138- Encapsulation I 1-139 - Enclosure
1.140 - Glovebag j 1.141 - Tent 1-137 - ACM Disturbance, RemoveL, Handling
1-146 - Preliminary Clean-up j 1-147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date: / /
Project ongoing, expected completion date: / /
Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat I
Follow up necessary on / /
Samples taken: No Yes 1 2 3
4 5 6 Photos taken: ' I Yes ;)<" No
Additional comments:
' ( -h--1 Ya Ccr7it
p(~
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) ) — ('
NYC-WTC 000100563