NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: FL SF I LF
roof 5,509 0
ONLY TYPEWRITTEN -
TRU1103MN02 I- aca 7,169 0
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT Yes
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERT STREET/113-117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER
NAME: BALDWIN REALTY, C/O CHARLES GANLER
-- - - — - — - - --- -
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION # : PII
ADDRESS: 1420 129TH STREET CITY: COLLEGE POINT STATE: IN ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET _ CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE V DAY 1 EVENING NIGHT 1/I WEEKENDS ,'' WEEKDAYS
INSPECTOR NAME: P fW) yyz o I'lds..a-7 SQUAD #: / BADGE #:
DATE OF INSPECTION: 1/ « f0 y TIME OF INSPECTION: From: AM i PM I
To: AM PM
Contact at site: S - c L - -( ,j c-- ~, o 1-uo
Inspection disclosed that the following sections were complied with: (Check all that apply)
1 1-51 Notifications, Reports, Pla 1.71 • Air Sampling and Monitorin 1.91 . Worker Protection
1-101 - Materials and Equipment 1-116 - Work Place Preparation 1-117 - Worker Decontamination System
1.118. Waste Decontamination System 1126 - Engineering Controls 1-127 - Entry/Exit Procedures
1-129 - Maintenance of Barriers 1.138 - Encapsulation I j 1.139 • Enclosure
1-140 - Glovebag 1141 - Tent F ] 1137 . ACM Disturbance, RemoveL, Handling
1-146- Preliminary Clean-up f 1 1.147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date: / /_
X Project ongoing, expected completion date:
Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat
f -
f Follow up necessary on
Samples taken: ,x No Yes 1 2 3
4 5 - 6 - Photos taken: Yes No
Additional comments: L aw bock O Jh c s ~
L(e
~. • d
CcuY1 y c d g0 e cs' v? -tiJ L ~S cJicrSn
- - ---w-e crag G (.as t. ,
1 Cce.d C _ 'cL&e L -for morrazj- - -
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
2_
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
f
NYC-WTC 000100576
OCR can misread numbers and units. Confirm readings against the page image before using them.