NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: FL I SF I IF
roof 5,509 _0
ONLY TYPEWRITTEN
TRU1103MN02 a a 7,169 0
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERT/STREET/113-117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
1I. BUILDING OWNER
NAME: BALDWIN REALTY, C/O CHARLES GANLER
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 9614100 FEDERAL EMPLOYER IDENTIFICATION #: I PII
ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE V DAY VI EVENING NIGHT i1/I WEEKENDS 1 WEEKDAYS
INSPECTOR NAME: n c
RD"- w -LO h~~+ SQUAD #: / BADGE #:
DATE OF INSPECTION: -7/ 18 X02 - TIME OF INSPECTION: From: Q wvrl AM I PM
To: ç -)4., AM I PM J
Contact at site: Scx~, /
S' me. 17 Srt7 ç - -cm /
o l ° is
~ (S
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 - Notifications, Reports, Pla 1 1-71 Air Sampling and Monitorin I 1-91 Worker Protection
1.101 - Materials and Equipment 1 1-116 - Work Place Preparation 1-117 - Worker Decontamination System
1.118 -Waste Decontamination System J 1.126 -Engineering Controls i 1.127 - Entry/Exit Procedures
1-129 -Maintenance of Barriers I J 1.138 - Encapsulation 1.139 - Enclosure
1140 - Glovebag j 1 1-141 -Tent 1.137 -ACM Disturbance, RemoveL, Handling
1-146 Preliminary Clean-up I 1 1147 - Final Clean-up
Project not started - . Inspection
revealed all ACM to be intact. New start date: / /
Project ongoing, expected completion date: 1
Project completed on or about / /- All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on I
Samples taken: X1 No 1 1 Yes 1 2 3
4 5 6 Photos taken: j Yes No
Additional comments:
1 k- ----1 y Cam,
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND r]
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
- '1'
NYC-WTC 000100575