NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 34/112 LIBERTY 1001042, 52/7501
Document / 18 pages

Invoice for roof cleanup, 110 Liberty Street, July 2002

Machine-extracted title · confidence 95%

Itemized invoice from Asbestos Removal Corp. detailing costs for asphalt and gravel roof cleanup at 110 Liberty Street.

NYC-WTC_000100549–000100566

Folder label: “112 LIBERTY 1001042, 52/7501”

Page image
Scanned page image, NYC-WTC_000100564
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0 ASBESTOS INSPECTION REPORT Basis of Inspection: FL I SF LF roof 5,509 1 0 TRU1103MN02 I i a a 7,169 0 ONLY TYPEWRITTEN APPLICATIONS WILL EE • NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1• $0.00 OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 7/16/02 COMPLETION DATE: 7/30/02 I. FACILITY ADDRESS: 110 LIBERT STREET/113-117 CEDER ST BORO: MANHATTAN ZIP: 10004

TYPE OFFACILITY: BLOCK: LOT:

II. BUILDING OWNER 'f +

NAME: BALDWIN REALTY, C/O CHARLES GANLER TEL. #: ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION B: [ P1.

ADDRESS: 1420 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356

V. THIRD PARTY AIR MONITOR NAME: WARREN & PANZER ENGINEERS, P.C. TEL. #: (212) 922-0077 ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 !' DAY V EVENING V NIGHT V WEEKENDS ', WEEKDAYS ASBESTOS WORK SCHEDULE

INSPECTOR NAME: ' - R ./s? 1')-r I lln,r/ SQUAD #: / BADGE #: 4p",ç'

DATE OF INSPECTION: l f0 2 TIME OF INSPECTION: From: $~ AM PM

To: Cj AM j PM Contact at site: S' s -. c' c ,,; I L / ~~ s

Inspection disclosed that the following sections were complied with: (Check all that apply) 1 51 - Notifications, Reports, Pla 1-71 . Air Sampling and Monitorin 1.91 • Worker Protection i t 1 1101 • Materials and Equipment i 1-116. Work Place Preparation 1117 - Worker Decontamination System

1118 - Waste Decontamination System j 1-126 - Engineering Controls I 1127 - Entry/Exit Procedures

1 I 1.129 - Maintenance of Barriers 1-138 - Encapsulation 1-139 - Enclosure

I j 1-140 - Glovebag i 1-141 - Tent j j 1137 - ACM Disturbance, RemoveL, Handling

1.146 - Preliminary Clean-up j 1.147 - Final Clean-up

Project not started . Inspection

revealed all ACM to be intact. New start date: ongoing, expected completion date: Y~I Project Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on

Samples taken: No Yes 1 2 3 1 4 5 6 Photos taken: j Yes No

Additional comments: I t

h c~~f csv yc r^I C ci ~7 pt4 4 ° ter-✓J - -C Ili cn, sr I r I

0 I

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS

4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000100564

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100564Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →