NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: FL I sr I LF
5,509 0
ONLY TYPEWRITTEN
TRU1103MP102 I roof aqa 7,169 0
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: Yes
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERT STREET/113.117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER
NAME: BALDWIN REALTY, C/0 CHARLES GANLER
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION # : L PII
ADDRESS: 1420 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE J'i DAY EVENING V NIGHT V) WEEKENDS Vi WEEKDAYS
INSPECTOR NAME: Q , R{a-M ,7-7-2.o h-.Lt.n SQUAD #: ) BADGE #:
DATE OF INSPECTION: 7 / 20 /0 2 TIME OF INSPECTION: From: o AM L 1 PM I
To: AM PM
Contact at site: c 5 1- L 5 i yy/i i p' c r edo
1
Inspection disclosed that the following sections were complied with: (Check all that apply)
1.51 . Notifications, Reports, Pla 1.71 . Air Sampling and Monitorin I 1.91 - Worker Protection
1.101 - Materials and Equipment [ ] 1.116. Work Place Preparation 1 1-117 - Worker Decontamination System
1.118. Waste Decontamination System I 1-126 - Engineering Controls j 1-127 - Entry/Exit Procedures
1.129 . Maintenance of Barriers I 1 1.138. Encapsulation 1 1139 . Enclosure
1.140 - Glovebag ] 1141 - Tent I 1-137 ACM Disturbance, RemoveL, Handling
1.146 . Preliminary Clean-up I 1147 - Final Clean-up
t -
I Project not started . Inspection
revealed all ACM to be intact. New start date:
l I Project ongoing, expected completion date: / /
Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat
I I Follow up necessary on
Samples taken: I~ I No L l Yes 1 2 3
4 5 6 Photos taken: Yes No
Additional comments:
L'6eY 5 ~J
~rLaLJ Sz~e c✓~r!C
c ,
.L1 -?tom
`tr k- V?suJ cLs~ecAay7 4r~ Ccy) u.c {tea e q ; 3,
was C t ear .
C ,-.9a -r cf - s . te ('-S 5Lk tp or
.- ---
7~2-1x02 • f
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
Z_
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS
SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000100577
OCR can misread numbers and units. Confirm readings against the page image before using them.