NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 59060 0
ASBESTOS INSPECTION REPORT Basis of Inspection: FL SF 1 LF
roof 13,560 0
TRU1454MN02_ I faga. 45,500__ 0
ONLY TYPEWRITTEN
APPLICATIONS WILL BE --- - ---------
NOTE: ASBESTOS INSPECTION REPORT SHALL FEE EXEMPT: Yes
BE SUBMITTED
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 8/1/2002 COMPLETION DATE: 9/30/2002
I. FACILITY
ADDRESS: 40 EXCHANGE PLACE BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER
NAME: N/A
TEL. #:
ADDRESS: N/A N/A N/A N/A CITY: N/A STATE: N/A ZIP: 11368
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORP
TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION # : l P11
ADDRESS: 14-20 129TH STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE ❑d DAY k EVENING ❑ NIGHT ❑ WEEKENDS 0 WEEKDAYS
INSPECTOR NAME: Ra RI M1raON9 SQUAD #: j BADGE #:
DATE OF INSPECTION: TIME OF INSPECTION: From: c2s AM PM
i►?t~' Z
To: J AM j PM
Contact at site ? Lti~CAstc C ~~
GmY
Inspection disclosed that the following sections were complied with: (Check all that apply) ~y(az
1-51 -Notifications, Reports, Plan [ 1-71 -Air Sampling and Monitoring 1-91 - Worker Protection
L_ —
1-101 - Materials and Equipment r 1 1-116 - Work Place Preparation 1-117 - Worker Decontamination System
1-118 - Waste Decontamination System L 1 1-126 - Engineering Controls 1-127 - Entry/Exit Procedures
1 1-129 - Maintenance of Barriers r 1 1-138 Encapsulation —j 1-139 -Enclosure
1-140 - Glovebeg L 1-141 Tent r J 1-137 ACM Disturbance, RemoveL Handling
1-146 - Preliminary Clean-up 7 1-147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be Intact. New start date:
Project ongoing, expected completion date: /
Project completed on or about: / . All surfaces, including abated surfaces are free of visible ACM end encapsulate
Follow up necessary on
Samples taken: No L_ J Yes 1 2 3
-- ----!~---------
Photos taken: El Yes No
Additional comments: v' ~~---~
7 7u.
i oL
— -- _ - - ___ _
.__RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS --
s Rv iNmnLs
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOVI
NYC-WTC 000130918