NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 34/51 MURRAY ST 1001438, 133/10
Document / 1 page

51 MURRAY ST 1001438, 133/10

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000100320
Page image
Scanned page image, NYC-WTC_000100320
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 4420 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0921M ONLY TYPEWRITTEN F FEE EXEMPT: Yes APPLICATIONSWKLBE ------ INSPECTION +NOTE: ASBESTOS --REPORT --- SHALL BE SUBMITTED — 1. ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE OF START OF THE WORK (ABATEMENT ACTIVITIES) L ' Variance

START DATE: 6/21/02 PROJ. COMPLETION DATE: 7/25/02 1. FACILITY ADDRESS: 51 MURRAY ST. BORO: MANHATTAN ZIP: 10007 TYPE OFFACILITY: BLOCK: LOT: U. BUILDING OWNER NAME: 51 UNITED CORP. Contact pRAMELA LEE TEL #: ADDRESS: 51 MURRAY ST. CITY: NY STATE: NY ZIP: 10007 IV. ASBESTOS ABATEMENT CONTRACTOR NAME: FIBER CONTROL INC. TEL #: (516) 781.3000 FEDERAL EMPLOYER IDENTIFICATION # : P11 ADDRESS: 3010 BURNS AVE CITY: WANTAGH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC - NEW YORK Cl NYS ELAP #: 11480 ASBESTOS WORK SCHEDULE WEEKDAYS INSPECTOR NAME: A. 110 EXA Z SQUAD #: { BADGE #: DATE OF INSPECTION: % /' ç /p TI OF INSPECTION: From: ~~I AM PM 0 0 To AM PM Contact at site: PAMELALEE _

Inspection disclosed that the following sections were complied with: (Check all that apply) 1-51 _Notifications, Reports, Pla 1.71 'Air Sampling and Monitorin 1.91 • Worker Protection 1.101 • Materials and UP Equipment ui _ r' 1.116 •Work Place Preparation ~^ i J 1.117. Worker Decontamination System 1-118 -Waste Decontamination System 1.126 • Engineering Controls 1.127 • Entry/Exit Procedures 1-129 - Maintenance of Barriers 1.138 - Encapsulation Cj 1.139 • Enclosure 1.140_Glovebag C 1.141 •Tent 1.137 • ACM Disturbance, RemoveL, Handling 1-146- Preliminary Clean-up 1.147 - Final Clean-up Project not started ---~ -----_ -- --- . Inspection revealed all ACM to be intact- New start date: / / Project ongoing, expected completion date: / / - Project completed on or about / / - All surfaces, including abated surfaces are free of visible ACM and encapsulati — _ Follow up necessary on / / Samples taken: J No L ! Yes 1 2 3 4. Photos taken: - — 5 6 a Yes I No ~I Additional comments: t ' ~- __ -

BORO I = MANHATTAN 2= BRONX 3= BROOOKLYN 4 * QUEENS ResuiT cone 5= STATEN ISLAND RESULT CODES 1 = VIOLATION IS SUED 2 = NO VIOLATION ISSUED 4 = PROJECT NOT STARTED (NO NOV) 3 = NO ACCESS F--- 5i, R SOR INITIALS -- - 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000100320

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100320Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →