NYC 9/11 Public Portal Document
TOTAL FEET: 4420 0
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT
TRU0921M
ONLY TYPEWRITTEN F FEE EXEMPT: Yes
APPLICATIONSWKLBE ------ INSPECTION
+NOTE: ASBESTOS --REPORT
--- SHALL BE SUBMITTED
— 1.
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES) L ' Variance
START DATE: 6/21/02 PROJ. COMPLETION DATE: 7/25/02
1. FACILITY
ADDRESS: 51 MURRAY ST. BORO: MANHATTAN ZIP: 10007
TYPE OFFACILITY: BLOCK: LOT:
U. BUILDING OWNER
NAME: 51 UNITED CORP. Contact pRAMELA LEE
TEL #:
ADDRESS: 51 MURRAY ST. CITY: NY STATE: NY ZIP: 10007
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: FIBER CONTROL INC.
TEL #: (516) 781.3000 FEDERAL EMPLOYER IDENTIFICATION # : P11
ADDRESS: 3010 BURNS AVE CITY: WANTAGH STATE: NY ZIP: 11793
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC - NEW YORK Cl
NYS ELAP #: 11480
ASBESTOS WORK SCHEDULE WEEKDAYS
INSPECTOR NAME: A. 110 EXA Z SQUAD #: { BADGE #:
DATE OF INSPECTION: % /' ç /p TI OF INSPECTION: From: ~~I AM PM
0 0
To AM PM
Contact at site: PAMELALEE _
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 _Notifications, Reports, Pla 1.71 'Air Sampling and Monitorin 1.91 • Worker Protection
1.101 • Materials and UP
Equipment
ui _ r' 1.116 •Work Place Preparation ~^
i J 1.117. Worker Decontamination System
1-118 -Waste Decontamination System 1.126 • Engineering Controls 1.127 • Entry/Exit Procedures
1-129 - Maintenance of Barriers 1.138 - Encapsulation Cj 1.139 • Enclosure
1.140_Glovebag C 1.141 •Tent 1.137 • ACM Disturbance, RemoveL, Handling
1-146- Preliminary Clean-up 1.147 - Final Clean-up
Project not started ---~
-----_ -- --- . Inspection
revealed all ACM to be intact- New start date: / /
Project ongoing, expected completion date: / /
- Project completed on or about / / - All surfaces, including abated surfaces are free of visible ACM and encapsulati
— _ Follow up necessary on / /
Samples taken: J No L ! Yes 1 2 3
4. Photos taken:
- — 5 6 a Yes I No ~I
Additional comments: t ' ~-
__ -
BORO I = MANHATTAN 2= BRONX 3= BROOOKLYN 4 * QUEENS ResuiT cone
5= STATEN ISLAND
RESULT CODES 1 = VIOLATION IS SUED 2 = NO VIOLATION ISSUED
4 = PROJECT NOT STARTED (NO NOV)
3 = NO ACCESS
F--- 5i, R SOR INITIALS
-- -
5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000100320