NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 45/109 READE STREET Block: 145 Lot: 7503 BIN: 1077809 AKA's:
Document / 12 pages

Invoice for facade remediation, 109 Reade Street, July 2002

Machine-extracted title · confidence 100%

Invoice from Fiber Control Inc. dated July 12, 2002 for facade remediation services at 109 Reade Street.

NYC-WTC_000114642–000114653

Folder label: “109 READE STREET Block: 145 Lot: 7503 BIN: 1077809 AKA's:”

Page image
Scanned page image, NYC-WTC_000114652
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 3625 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT 1 i jo 7Mo21 FEE EXEMPT: Yes ONLY TYPEWRITTEN __ _--_ APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑ Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 6/27/02 PROJ. COMPLETION DATE: 8/30/02

I. FACILITY ADDRESS: 109 READE STREET BORO: MANHATTAN ZIP: 10013 TYPE OFFACILITY: BLOCK: 145 LOT: 7503

II. BUILDING OWNER NAME: FIRST READE CONDO Contact TEL. #: ADDRESS: 109 CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: FIBER CONTROL INC. TEL. #: (516) 781-3000 FEDERAL EMPLOYER IDENTIFICATION #: P11 ADDRESS: 3010 BURNS AVE CITY: WANTAGHH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC - NEW YORK CI NYS ELAP #: 11480 --- — ------ - ----

ASBESTOS WORK S HEDULE ❑ DAY ❑ EVENING L NIGHT Li WEEKENDS L WEEKDAYS

INSPECTOR NAME: c SQUAD #: BADGE #: La

DATE OF INSPECTION: O` TIME SPECTION: From: S ' AM PM II F1

Contact at site:

Inspection disclosed that the following sections were complied with: (Check all that apply) —_ --- --_— — J ------------- --- -- ---- 1 1.51 - Notifications, Reports, Pla n 1.71 - Air Sampling and Monitorin Lii 1.91 - Worker Protection

[_- i 1-101 - Materials and Equipment LJ 1-116 -Work Place Preparation 1.117 - Worker Decontamination System

1.118 Waste Decontamination System r 1-126 - Engineering Controls 1.127 - Entry/Exit Procedures.

1-129 - Maintenance of Barriers 1.138 - Encapsulation 1.139 - Enclosure

[ 1 1.140 - Glovebag LI] 1-141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling

i 1-146 - Preliminary Clean-up a 1-147 - Final Clean-up

L .J Project not started . Inspection

revealed all ACM to be intact. New start date:

L i Project ongoing, expected completion date: L Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat e

—] Follow up necessary on / Samples taken: I No Li Yes 1 2 3

1 4 5 6 Photos taken: Yes j No

Additional comments:

I YVS1, c ---------

RESULT CODE 1 BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND I RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS y si evFs FTIALS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) —_—~

NYC-WTC 000114652

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000114652Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →