NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 49/173 BROADWAY 1001079, 63/21
Document / 13 pages

Asbestos roof cleanup invoice for multiple sites, June 2002

Machine-extracted title · confidence 98%

Invoice from Fiber Control, Inc. for asbestos roof cleanup services at 173 Broadway and other locations in June 2002.

NYC-WTC_000122562–000122574

Folder label: “173 BROADWAY 1001079, 63/21”

Page image
Scanned page image, NYC-WTC_000122573
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ia1.

TOTAL FEET: 6120 0 I' NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT I TRUO892MN02 FEE EXEMPT: Yes ONLY TYPEWRfTTEN- APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE OF START OF THE WORK (ABATEMENT ACTIVITIES) L Variance

START DATE: 6/18/02 PROJ. COMPLETION DATE: 6/18/02 I. FACILITY ADDRESS: 173 BROADWAY BORO: MANHATTAN ZIP: 10007 TYPE OFFACILITY: BLOCK: LOT: II. BUILDING OWNER NAME: BROADWAY AND CORTLANDT REALTY Contact JDAVID TEL. #: ADDRESS: 2-8 CORTLANDT ST. CITY: NY STATE: NY ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME: FIBER CONTROL INC. TEL. #: (516) 781-3000 FEDERAL EMPLOYER IDENTIFICATION #: PII ADDRESS: 3010 BURNS AVE CITY: WANTAGH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC - NEW YORK Cl NYS ELAP #: 11480 ASBESTOS WORK HEDULE ! AY EVENING NIGHT i WEEKENDS L WEEKDAYS INSPECTOR NAME: SQUAD #: 1 BADGE #: - —1 ----- _-- DATE OF INSPECTION: — Q ME OF INSPECTION: From: j . M~ AM L-1 PM To: O M AM PM Contact at site: f (1b

Inspection disclosed that the following sections were complied with: (Check all that apply) 1-51 - Notifications, Reports, Pla 1-71 - Air Sampling and Monitorin L 1-91 -Worker Protection 1.101 - Materials and Equipment 1-116 - Work Place Preparation j 1-117 - Worker Decontamination System 1.118 - Waste Decontamination System 1-126 - Engineering Controls j_ 1-127 Entry/Exit Procedures 1.129. Maintenance of Barriers j 1.138 - Encapsulation j 1-139 Enclosure J 1.140 - Glovebag r ) 1.141 - Tent 1.137 • ACM Disturbance, RemoveL, Handling 1.146 - Preliminary Clean-up 1-147. Final Clean-up Project not started . Inspection revealed all ACM to be intact. New start date: Project ongoing, expected completion date:

Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat Follow up necessary on Samples taken: No 1 Yes 1 2 3 4 5 6 Photos taken: Yes No L I Additional comments: L pr W€-.-t_ o evr, _(24 ], ,— ~3I o 1' iL.r_ moo..

c --e, _ ter, L ` --- s . ,ate

BORO 1 = MANHATTAN RESULT CODE 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND j RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR TIALS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) _ -

NYC-WTC 000122573

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000122573Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →