NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 8 pages

Asbestos inspection report header, unknown date

Machine-extracted title · confidence 90%

Fragmented header page of an asbestos inspection report for the WTC site, indicating fee exemption and variance status.

NYC-WTC_000107873–000107880

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107877
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE 6/20/02 PROJ. COMPLETION DATE: 6/30/02

I. FACILITY ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006

TYPE OFFACILITY: BLOCK: 52 LOT: 21

II. BUILDING OWNER NAME: 120 LIBERTY STREET, LLC Contact

TEL. #: ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error _._, TEL. #: (718) 9614100 FEDERAL EMPLOYER IDENTIFICATION # PII ADDRESS: 14.20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251

ASBESTOS WORK SCHEaULE V DAY V EVENING V NIGHT WEEKENDS WEEKDAYS (~ INSPECTOR NAME: l~ ~ C SQUAD #: I BADGE #:

DATE OF INSPECTION: / ', TIME OF INSPECTION: From: AM /PM

W C 1. ~t (9 To: if AM PML Contact at site: , Inspectio sclosed that the following sections were complied with: (Check all that apply) 1 51 Notifications, Reports, Pla 71 - Air Sampling and Monitorin Worker Protection

1.101 . Materials and Equipment 1116. Work Place Preparation 1.117. Worker Decontamination System

1-118 - Waste Decontamination System 1-126. Engineering Controls ~r127 - Entry/Exit Procedures

1129. Maintenance of Barriers 1-138 - Encapsulation 1.139 . Enclosure

1-140 - Glovebag 1-141 - Tent 137 . ACM Disturbance, RemoveL, Handling

1-146 - Preliminary Clean-up 1-147 - Final Clean-up

Project not started . Inspection

revealed all ACM to be intact. New start date: / / Project ongoing, expected completion date: / /

Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on / /

Samples taken: No Yes 1 2 3

4 5 6 Photos taken: Yes No Additional comments: L • ~ ~~X ~y K ' ~A, i4 `I 1i~..^%, L,0...s a~,. -Q-- * \~ • ~r s ..~. u-1opt

RESUL BORO 1 =MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 =QUEENS 5 =STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS supERvi mna 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107877

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107877Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →