NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report cover letter, unknown date

Machine-extracted title · confidence 95%

Cover letter accompanying an asbestos inspection report for a WTC site, noting fee exemption and variance status.

NYC-WTC_000107861–000107864

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107861
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I I __

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENT L PROTECTION Basis of Inspection: ASBESTOS INSPECTION R PORT LTRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN 1. $0.00 APPucanONS w/u BE NOTE: ASBESTOS INSPECTION REPORT BE UBMITTED I ACCEPrED ADVANCE TO NYC DEP NOT LESS THAN ONE W 1 Variance SHJATIVITIES) OF START OF THE WORK (ABATEME

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

I. FACILITY ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006 ----------- — - - --- TYPE OFFACILITY: BLOCK: 52 4 LOT: 21

11. BUILDING OWNER 120 LIBERTY STREET, LLC Contagt NAME: -------- TEL. #: -.. ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION #: PII ADDRESS: 1420 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356

VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 Wi DAY 1 EVENING D%. NIGHT J WEEKENDS F WEEKDAYS ASBESTOS WO K SCHEDULE

INSPECTOR NAME: I'14 l .y~(C 14W► CEO 1 .. SQUAD #: 3 BADGE #: // DATE OF INSPECTION: /'2j. / 0 Z TIME OF INSPECTION: From: p AM '-PM iii To: AM C PM Contact at site: 01, >11E~. y. 4 Inspectio isclosed that the following sections were complied with: (Check all th4t apply) 1.51 - Notifications, Reports, Pla 1.71 -Air Sampling and M itorin 1 .91 - Worker Protection

r 1.101 - Materials and Equipment 1-116 - Work Place Preparaltion 17 •Worker Decontamination System

L — 1-118 - Waste Decontamination System 1.126 - Engineering Controls [Ji127. Entry/Exit Procedures J 1.129 - Maintenance of Barriers 1 138 -Encapsulation Liii 1-139- Enclosure

1.140. Glovebag 1.141 - Tent 1137 • ACM Disturbance, RemoveL, Handling

1.146 • Preliminary Clean-up j~ -i 1.147 •Final Clean-up Inspection J Project not started _ ____ . __—_ , ----J i

revealed all ACM to be intact. New start date:

Liii Project ongoing, expected completion date: Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on

Samples taken: I No LI j Yes 1 21 3

4 5 6 I Photos taken: Yes No

Additional comments: °

k

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND i I RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS I

4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107861

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107861Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →