NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report cover sheet, 120 Liberty St

Machine-extracted title · confidence 85%

Cover page of an asbestos inspection report for 120 Liberty Street and 125 Cedar Street indicating a fee exemption status.

NYC-WTC_000107865–000107868

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107867
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT i TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL E SUBMITTED i 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK{IN ADVANCE i j Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 6/20/02 PROJ. COMP~.ETION DATE: 6/30/02

I. FACILITY ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 52 LOT: 21

II. BUILDING OWNER NAME: 120 LIBERTY STREET, LLC Contact --- TEL. #: ADDRESS: N/A CITY: ! STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error _._._._.._._._._._._._._._., TEL. #: (718) 961-4100 FEDERAL EMPLOYER IDENTIFICATION 4: .............P11 ADDRESS: 1420 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIEf C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHE aULE I DAY iV' EVENING M NIGHT WEEKENDS V WEEKDAYS INSPECTOR NAME: ARk- C V%&1 L SQUAD #: ( BADGE #:

DATE OF r ', ,) TIME OF INSPECTION: From: _ AM i~Lf._PM '

INSPECTION::. f To: ~.._ ! J AM ' PM Contact at site: ~\~` C7 0 ~ tab W C _L 8k, 9 (9

Inspectio sclosed that the following sections were complied with: (Check all th It apply) 1 51 Notifications, l ir Sampling and Mlnito ..—rf i Worker Protection 1-101 Materiallsnand Equipment .1 16 -Work Place Prparaitionr'n Worker Decontamination System 1118 Waste Decontamination System L_ 1 1.126- Engineering Control —tT127 Entry/Exit Procedures

1-129 - Maintenance of Barriers I 1.138. Encapsulation 1.139 . Enclosure 1140 Glovebag 1.141 • Tent 4A1.137 - ACM Disturbance, RemoveL, Handling i 1.146 - Preliminary Clean-up 1147 Final Clean-up

Project not started Inspection revealed all ACM to he intact. New start date: / / Project ongoing, expected completion date: / /

Project completed on or about / / All surfaces, includingabated surfaces are free of visible ACM and encapsulat'

Follow up necessary on / / Samples taken: i No I I Yes 1 2 3 4 5 6 L. Photos taken: Yes 1 No Additional comments: lM " 1 6wtl~ ~n.Pti 3k CM~+r lw a S a A .. ~0 _ I

BORO 1 =MANHATTAN 2 =BRONX 3 = BROOOKLYN REsuL 4 —QUEENS 5 =STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVI INITIA 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107867

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107867Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →