Document / 8 pages

Air sample results and clearance letter, Warren & Ward, July

Machine-extracted title · confidence 50%

A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.

NYC-WTC_000100831–000100838

Folder label: “114 LIBERTY STREET 1001041, 52/7502”

Page image
Scanned page image, NYC-WTC_000100834
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 42425 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT ~TRU0930MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN _ -- - _- _ - — .—._._..._. . _.. _— --: APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED - 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCCE LII Variance OF START OF THE WORK (ABATEMENT ACTIVRIES)

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

1. FACILITY ADDRESS: 114 LIBERTY ST. / 119 CEDAR ST. BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 52 LOT: 7502

II. BUILDING OWNER NAME: BUILDING OWNER/ MANAGER Contact • TEL. #: ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION if : P11 ADDRESS: 1420 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/0 WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE wf DAY L! EVENING -=: NIGHT C. WEEKENDS El WEEKDAYS ~( INSPECTOR NAME: ~' L~ITGt{W~(-y,/Is-t SQUAD #: BADGE #: DATE OF INSPECTION: r - / / O Z' TIME OF INSPECTION: From: AM -/ -- PM r

Contact at site: ~F~~- a`~V.•. t~q ~~ Y __

Inspection disclosed that the following sections were comp led with: (Check all that apply) I .1 - -51 - Notifications, Reports, Pla 1.71 • Air Sampling and Monitorin 1.91 - Worker Protection 1.101 • Materials and Equipment ✓ 1.116 - Work Place Preparation L X1'117 • Worker Decontamination System 1.118 - Waste Decontamination System [ 1 1.126 . Engineering Controls i !27 • Entry/Exit Procedures 1.129 - Maintenance of Barriers i. ~ 1.138 - Encapsulation L 1.139 - Enclosure 1.140 - Glovebag 1.141 - Tent LIII 1.137 • ACM Disturbance, RemoveL. Handling 1.146 •Preliminary Clean-up ` 1-147 - Final Clean-up Project not started . Inspection revealed all ACM to be intact. New start date: / / Project ongoing, expected completion date: / /

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat -- ---- ---- Follow up necessary on / / Samples taken: No LII Yes 1 — - - ' 2 - 3 _ 4 5 6 Photos taken: j Yes _ Additional comments

L- w W O.teI. ~"i~! 1 Y_u+oa u4w t., C ~t 5 -► .. in, .S.i t , -w a t<. ' ' _. ~...► -~~„: L,~ c 4~o --I

BORO I =MANHATTAN 2 = BRONX RESULT CODE 3 = BROOOKLYN 4 =QUEENS 5 =STATEN ISLAND I •^~ i RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS i SUPER ALS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) I I

NYC-WTC 000100834

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100834Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.